Neutral Citation Number: [2024] EWHC 134 (KB)
Claim no: QB-2022-000904

IN THE HIGH COURT OF JUSTICE
KING'S BENCH DIVISION
THE ROYAL COURTS OF JUSTICE

26th January 2024

B e f o r e :

MR JUSTICE RITCHIE
____________________

(1) VALERO ENERGY LTD
(2) VALERO LOGISTICS UK LTD
(3) VALERO PEMBROKESHIRE OIL TERMINAL LTD
Claimants
- and -

(1) PERSONS UNKNOWN WHO,
IN CONNECTION WITH ENVIRONMENTAL PROTESTS BY THE 'JUST STOP OIL' OR 'EXTINCTION REBELLION' OR 'INSULATE BRITAIN' OR 'YOUTH CLIMATE SWARM' (ALSO KNOWN AS YOUTH SWARM) MOVEMENTS ENTER OR REMAIN WITHOUT THE CONSENT OF THE FIRST CLAIMANT UPON ANY OF THE 8 SITES (defined below)

(2) PERSONS UNKNOWN WHO,
IN CONNECTION WITH ENVIRONMENTAL PROTESTS BY THE 'JUST STOP OIL' OR 'EXTINCTION REBELLION' OR 'INSULATE BRITAIN' OR 'YOUTH CLIMATE SWARM' (ALSO KNOWN AS YOUTH SWARM) MOVEMENTS CAUSE BLOCKADES, OBSTRUCTIONS OF TRAFFIC AND INTERFERE WITH THE PASSAGE BY THE CLAIMANTS AND THEIR AGENTS, SERVANTS, EMPLOYEES, LICENSEES, INVITEES WITH OR WITHOUT VEHICLES AND EQUIPMENT TO, FROM,
OVER AND ACROSS THE ROADS IN THE VICINITY OF THE 8 SITES (defined below)
(3) MRS ALICE BRENCHER AND 16 OTHERS
Defendants

____________________

Katharine Holland KC and Yaaser Vanderman
(instructed by CMS Cameron McKenna Nabarro Olswang LLP) for the Claimant.
The Defendants did not appear.

Hearing date: 17th January 2024

____________________

HTML VERSION OF APPROVED JUDGMENT
____________________

Crown Copyright ©

    This judgment was handed down remotely at 14.00pm on Friday 26th January 2024 by circulation to the parties or their representatives by e-mail and by release to the National Archives.

    Mr Justice Ritchie:

    The Parties

  1. The Claimants are three companies who are part of a large petrochemical group called the Valero Group and own or have a right to possession of the 8 Sites defined out below.
  2. The "4 Organisations" relevant to this judgment are:
  3. 2.1 Just Stop Oil.

    2.2 Extinction Rebellion.

    2.3 Insulate Britain.

    2.4 Youth Climate Swarm.

    I have been provided with a little information about the persons who set up and run some of these 4 Organisations. They appear to be crowdfunded partly by donations. A man called Richard Hallam appears to be a co-founder of 3 of them.

  4. The Defendants are firstly, persons unknown (PUs) connected with 4 Organisations who trespass or stay on the 8 Sites defined below. Secondly, they are PUs who block access to the 8 Sites defined below or otherwise interfere with the access to the 8 Sites by the Claimants, their servants, agents, licensees or invitees. Thirdly, they are named persons who have been involved in suspected tortious behaviour or whom the Claimants fear will be involved in tortious behaviour at the 8 Sites and the relevant access roads.
  5. The 8 Sites

  6. The "8 Sites" are:
  7. 4.1 the first Claimant's Pembroke oil refinery, Angle, Pembroke SA71 5SJ (shown outlined red on plan A in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.2 the first Claimant's Pembroke oil refinery jetties at Angle, Pembroke SA71 5SJ (as shown outlined red on plan B in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.3 the second Claimant's Manchester oil terminal at Churchill Way, Trafford Park, Manchester M17 1BS (shown outlined red on plan C in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.4 the second Claimant's Kingsbury oil terminal at plot B, Trinity Road, Kingsbury, Tamworth B78 2EJ (shown outlined red on plan D in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.5 the second Claimant's Plymouth oil terminal at Oakfield Terrace Road, Cattedown, Plymouth PL4 0RY (shown outlined red on plan E in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.6 the second Claimant's Cardiff oil terminal at Roath Dock, Rover Way, Cardiff CF10 4US (shown outlined red on plan F in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.7 the second Claimant's Avonmouth oil terminal at Holesmouth Road, Royal Edward dock, Avonmouth BS11 9BT (shown outlined red on the plan G in Schedule 1 to the Order made by Bourne J on 28.7.2023);

    4.8 the third Claimant's Pembrokeshire terminal at Main Road, Waterston, Milford Haven SA73 1DR (shown outlined red on plan H in Schedule 1 to the Order made by Bourne J on 28.7.2023).

    Bundles

  8. For the hearing I was provided with a core bundle and 5 lever arch files making up the supplementary bundle, a bundle of authorities, a skeleton argument, a draft order and a final witness statement from Ms Hurle. Nothing was provided by any Defendant.
  9. Summary

  10. The 4 Organisations and members of the public connected with them seek to disrupt the petrochemical industry in England and Wales in furtherance of their political objectives and demands. After various public threats and protests and on police intelligence the Claimants issued a Claim Form on the 18th of March 2022 alleging that they feared tortious trespass and nuisance by persons unknown connected with the 4 Organisations at their 8 Sites and their access roads and seeking an interim injunction prohibiting that tortious behaviour.
  11. Various interim prohibitions were granted by Mr Justice Butcher on the 21st of March 2022 in an ex-parte interim injunction protecting the 8 Sites and access thereto. However, protests involving tortious action took place at the Claimant's and other companies' Kingsbury site between the 1st and the 15th of April 2022 leading to not less than 86 protesters being arrested. The Claimants applied to continue their injunction and it was renewed by various High Court judges and eventually replaced by a similar interim injunction made by Mr Justice Bourne on the 28th of July 2023.
  12. On the 12th of December 2023 the Claimants applied for summary judgment and for a final injunction to last five years with annual reviews. This judgment deals with the final hearing of that application which took place before me.
  13. Despite valid service of the application, evidence and notice of hearing, none of the named Defendants attended at the hearing which was in open Court and no UPs attended at the hearing, nor did any member of the public as far as I could see in Court. The Claimants' counsel informed me that no communication took place between any named Defendant and the Claimants' solicitors in relation to the hearing other than by way of negotiations for undertakings for 43 of the named Defendants who all promised not to commit the feared torts in future.
  14. The Issues

  15. The issues before me were as follows:
  16. 10.1 Are the elements of CPR Part 24 satisfied so that summary judgment can be entered?

    10.2 Should a final injunction against unknown persons and named Defendants be granted on the evidence presented by the Claimants?

    10.3 What should the terms of any such injunction be?

    The ancillary applications

  17. The Claimants also made various tidying up applications which I can deal with briefly here. They applied to amend the Claimants' names, to change the word "limited" to a shortened version thereof to match the registered names of the companies. They applied to delete two Defendants, whom they accepted were wrongly added to the proceedings (and after the hearing a third). They applied to make minor alterations to the descriptions of the 1st and 2nd Defendants who are unknown persons. The Claimants also applied for permission to apply for summary judgment. This application was made retrospectively to satisfy the requirements of CPR rule 24.4. None of these applications was opposed. I granted all of them and they are to be encompassed in a set of directions which will be issued in an Order.
  18. Pleadings and chronology of the action

  19. In the Claim Form the details of the claims were set out. The Claimants sought a quia timet (since he fears) injunction, fearing that persons would trespass into the 8 Sites and cause danger or damage therein and disrupt the processes carried out therein, or block access to the 8 Sites thereby committing a private nuisance on private roads or a public nuisance on public highways. The Claimants relied on the letter sent by Just Stop Oil dated 14th February 2022 to Her Majesty's Government threatening intervention unless various demands were met. Just Stop Oil asserted they planned to commence action from the 22nd of March 2022. Police intelligence briefings supported the risk of trespass and nuisance at the Claimants' 8 Sites. 3 unidentified groups of persons in connection with the 4 Organisations were categorised as Defendants in the claim as follows: (1) those trespassing onto the 8 Sites; (2) those blockading or obstructing access to the 8 Sites; (3) those carrying out a miscellany of other feared torts such as locking on, tunnelling or encouraging others to commit torts at the 8 Sites or on the access roads thereto. The Claim Form was amended by order of Bennathan J. in April 2022; Re amended by order of Cotter J. in September 2022 and re re amended in July 2023 by order of Bourne J.
  20. In late March 2022 Mr Justice Butcher issued an interim ex parte injunction on a quia timet basis until trial, expressly stating it was not intended to prohibit lawful protest. He prohibited the Defendants from entering or staying on the 8 sites; impeding access to the 8 sites; damaging the Claimants' land; locking on or causing or encouraging others to breach the injunction. The Order provided for various alternative methods of service for the unknown persons by fixing hard copies of the injunction at the entrances and on access road at the 8 Sites, publishing digital copies online at a specific website and sending emails to the 4 Organisations.
  21. Despite the interim injunction, between the 1st and the 7th of April 2022 protesters attended at the Claimants' Kingsbury site and 48 were arrested. Between the 9th and 15th of April 2022 further protesters attended at the Kingsbury site and 38 were arrested. No application to commit any person to prison for contempt was made. The protests were not just at the Claimants' parts of the Kingsbury site. They targeted other owners' sites there too.
  22. On the return date, the original interim injunction was replaced by an Order dated 11th of April 2022 made by Bennathan J. which was in similar terms and provided for alternative service in a similar way and gave directions for varying or discharging the interim injunction on the application by any unknown person who was required provide their name and address if they wished to do so (none ever did). Geographical plans were attached to the original injunction and the replacement injunction setting out clearly which access roads were covered and delineating each of the 8 Sites. Undertakings were given by the Claimants and directions were given for various Chief Constables to disclose lists and names of persons arrested at the 8 Sites on dates up to the 1st of June 2022.
  23. The Chief Constables duly obliged and on the 20th of September 2022 Mr Justice Cotter added named Defendants to the proceedings, extended the term of the interim injunction, provided retrospective permission for service and gave directions allowing variation or discharge of the injunction on application by any Defendant. Unknown persons who wished to apply were required to self-name and provide an address for service (none ever did). Then, on the 16th of December 2022 Mr Justice Cotter gave further retrospective permission for service of various documents. On the 20th of January 2023 Mr Justice Soole reviewed the interim injunction, gave permission for retrospective service of various documents and replaced the interim injunction with a similar further interim injunction. Alternative service was again permitted in a similar fashion by: (1) publication on a specified website, (2) e-mail to the 4 Organisations, (3) personal service on the named Defendants where that was possible because they had provided addresses. At that time no acknowledgement of service or defence from any Defendant was required.
  24. In April 2023 the Claimants changed their solicitors and in June 2023 Master Cook gave prospective alternative service directions for future service of all Court documents by: (1) publication on the named website, (2) e-mail to the 4 Organisations, (3) fixing a notification to signs at the front entrances and the access roads of the 8 Sites. Normal service applied for the named Defendants who had provided addresses.
  25. On the 28th of July 2023, before Bourne J., the Claimants agreed not to pursue contempt applications for breaches of the orders of Mr Justice Butcher and Mr Justice Bennathan for any activities before the date of the hearing. Present at that hearing were counsel for Defendants 31 and 53. Directions were given permitting a redefinition of "Unknown Persons" and solving a substantial range of service and drafting defects in the previous procedure and documents since the Claim Form had been issued. A direction was given for Acknowledgements of Service and Defences to be served by early October 2023 and the claim was discontinued against Defendants 16, 19, 26, 29, 38, 46 and 47 on the basis that they no longer posed a threat. A direction was given for any other Defendant to give an undertaking by the 6th of October 2023 to the Claimants' solicitors. Service was to be in accordance with the provisions laid down by Master Cook in June 2023.
  26. On the 30th November 2023 Master Eastman ordered that service of exhibits to witness statements and hearing bundles was to be by: (1) uploading them onto the specific website, (2) emailing a notification to the 4 Organisations, (3) placing a notice at the 8 Sites entrances and access roads, (4) postal service to of a covering letter named Defendants who had provided addresses informing them where the exhibits could be read.
  27. The Claimants applied for summary judgment on the 12th of December 2023.
  28. By the time of the hearing before me, 43 named Defendants had provided undertakings in accordance with the Order of Mr Justice Bourne. Defendants 14 and 44 were wrongly added and so 17 named Defendants remained who had refused to provide undertakings. None of these attended the hearing or communicated with the Court.
  29. The lay witness evidence

  30. I read evidence from the following witnesses provided in statements served and filed by the Claimants:
  31. 22.1 Laurence Matthews, April 2022, June 2023.

    22.2 David Blackhouse, March and April 2022, January, June and November 2023.

    22.3 Emma Pinkerton, June and December 2023.

    22.4 Kate McCall, March and April 2022, January (x3) 2023.

    22.5 David McLoughlin, March 2022, November 2023.

    22.6 Adrian Rafferty, March 2022

    22.7 Richard Wilcox, April and August 2022, March 2023.

    22.8 Aimee Cook, January 2023.

    22.9 Anthea Adair, May, July and August 2023.

    22.10 Jessica Hurle, January 2024 (x2).

    22.11 Certificates of service: supplementary bundles pages 3234-3239.

    Service evidence

  32. The previous orders made by the Judges who have heard the interlocutory matters dealt with all previous service matters. In relation to the hearing before me I carefully checked the service evidence and was helpfully led through it by counsel. A concern of substance arose over some defective evidence given by Miss Hurle which was hearsay but did not state the sources of the hearsay. This was resolved by the provision of a further witness statement at the Court's request clarifying the hearsay element of her assertion which I have read and accept.
  33. On the evidence before me I find, on the balance of probabilities, that the application for summary judgment and ancillary applications and the supporting evidence and notice of hearing were properly served in accordance with the orders of Master Cook and Master Eastman and the CPR on all of the Defendants.
  34. Substantive evidence

  35. David Blackhouse. Mr. Blackhouse is employed by Valero International Security as European regional security manager. In his earlier statements he evidenced his fears that there were real and imminent threats to the Claimants' 8 Sites and in his later statements set out the direct action suffered at the Claimants' sites which fully matched his earlier fears.
  36. In his first witness statement he set out evidence from the police and from the Just Stop Oil website evidencing their commitment to action and their plans to participate in protests. The website set out an action plan asking members of the public to sign up to the group's mailing list so that the group could send out information about their proposed activities and provide training. Intervention was planned from the 22nd of March 2022 if the Government did not back down to the group's demands. Newspaper reports from anonymous spokespersons for the group threatened activity that would lead to arrests involving blocking oil sites and paralysing the country. A Just Stop Oil spokesperson asserted they would go beyond the activities of Extinction Rebellion and Insulate Britain through civil resistance, taking inspiration from the old fuel protests 22 years before when lorries blockaded oil refineries and fuel depots. Mr. Blackhouse also summarised various podcasts made by alleged members of the group in which the group asserted it would train up members of the public to cause disruption together with Youth Climate Swarm and Extinction Rebellion to focus on the oil industry in April 2022 with the aim of causing disruption in the oil industry. Mr. Blackhouse also provided evidence of press releases and statements by Extinction Rebellion planning to block major UK oil refineries in April 2022 but refusing to name the actual sites which they would block. They asserted their protests would "continue indefinitely" until the Government backed down. Insulate Britain's press releases and podcasts included statements that persons aligned with the group intended to carry out "extreme protests" matching the protests 22 years before which allegedly brought the country to a "standstill". They stated they needed to cause an "intolerable level of disruption". Blocking oil refineries and different actions disrupting oil infrastructure was specifically stated as their objective.
  37. In his second witness statement David Blackhouse summarised the protest events at Kingsbury terminal on the 1st of April 2022 (which were carried out in conjunction with similar protests at Esso Purfleet, Navigator at Thurrock and Exolum in Grays). He was present at the Site and was an eye-witness. The protesters blocked the access roads which were public and then moved onto private access roads. More than 30 protesters blocked various tankers from entering the site. Some climbed on top of the tankers. Police in large numbers were used to tidy up the protest. On the next day, the 2nd of April 2022, protesters again blocked public and private access roads at various places at the Kingsbury site. Further arrests were made. Mr Blackhouse was present at the site.
  38. In his third witness statement he summarised the nationwide disruption of the petrochemical industry which included protests at Esso West near Heathrow airport; Esso Hive in Southampton, BP Hamble in Southampton, Exolum in Essex, Navigator terminals in Essex, Esso Tyburn Road in Birmingham, Esso Purfleet in Essex, and the Kingsbury site in Warwickshire possessed by the Claimants and BP. In this witness statement Mr. Blackhouse asserted that during April 2022 protesters forcibly broke into the second Claimant's Kingsbury site and climbed onto pipe racks, gantries and static tankers in the loading bays. He also presented evidence that protesters dug and occupied tunnels under the Kingsbury site's private road and Piccadilly Way and Trinity Road. He asserted that 180 arrests were made around the Kingsbury site in April 2022. He asserted that he was confident that the protesters were aware of the existence of the injunction granted in March 2022 because of the signs put up at the Kingsbury site both at the entrances and at the access roads. He gave evidence that in late April and early May protesters stood in front of the signs advertising the injunction with their own signs stating: "we are breaking the injunction". He evidenced that on the Just Stop Oil website the organisation wrote that they would not be "intimidated by changes to the law" and would not be stopped by "private injunctions". Mr. Blackhouse evidenced that further protests took place in May, August and September at the Kingsbury site on a smaller scale involving the creation of tunnels and lock on positions to facilitate road closures. In July 2022 protesters under the banner of Extinction Rebellion staged a protest in Plymouth City centre marching to the entrance of the second Claimant's Plymouth oil terminal which was blocked for two hours. Tanker movements had to be rescheduled. Mr. Blackhouse summarised further Just Stop Oil press releases in October 2022 asserting their campaign would "continue until their demands were met by the Government". He set out various protests in central London and on the Dartford crossing bridge of the M25. Mr. Blackhouse also relied on a video released by one Roger Hallam, who he asserted was a co-founder of Just Stop Oil, through YouTube on the 4th of November 2022. He described this video as a call to arms making analogies with war and revolution and encouraging the "systematic disruption of society" in an effort to change Government policies affecting global warming. He highlighted the sentence by Mr Hallam:
  39. "if it's necessary to prevent some massive harm, some evil, some illegality, some immorality, it's justified, you have a right of necessity to cause harm".

    The video concluded with the assertion "there is no question that disruption is effective, the only question is doing enough of it". In the same month Just Stop Oil was encouraging members of the public to sign up for arrestable direct action. In November 2022 Just Stop Oil tweeted that they would escalate their legal disruption. Mr. Blackhouse then summarised what appeared to be statements by Extinction Rebellion withdrawing from more direct action. However Just Stop Oil continued to publish in late 2022 that they would not be intimidated by private injunctions. Mr Blackhouse researched the mission statements of Insulate Britain which contained the assertion that their continued intention included a campaign of civil resistance, but they only had the next two to three years to sort it out and their next campaign had to be more ambitious. Whilst not disclosing the contents of the briefings received from the police it was clear that Mr. Blackhouse asserted, in summary, that the police warned that Just Stop Oil intended to have a high tempo civil resistance campaign which would continue to involve obstruction, tunnelling, lock one and at height protests at petrochemical facilities.

  40. In his 4th witness statement Mr Blackhouse set out a summary of the direct actions suffered by the Claimants as follows ("The Refinery" means Pembroke Oil refinery):
  41. "September 2019
    6.5 The Refinery was the target of protest activity in 2019, albeit this was on a smaller scale to that which took place in 2022 at the Kingsbury Terminal. The activity at the Refinery involved the blocking of access roads whereby the protestors used concrete "Lock Ons" i.e. the protestors locked arms, within the concrete blocks placed on the road, whilst sitting on the road to prevent removal. Although it was a non-violent protest it did impact upon employees at the Refinery who were prevented from attending and leaving work. Day to day operations and deliveries were negatively impacted as a result.
    6.6…
    Friday 1st April 2022
    Protestors obstructed the crossroads junction of Trinity Road, Piccadilly Way, and the entrance to the private access road by sitting in the road. They also climbed onto two stationary road tanker wagons on Piccadilly Way, about thirty metres from the same junction, preventing the vehicles from moving, causing a partial obstruction of the road in the direction of the terminal. They also climbed onto one road tanker wagon that had stopped on Trinity Road on the approach to the private access road to the terminal. Fuel supplies from the Valero terminal were seriously disrupted due to the continued obstruction of the highway and the entrance to the private access road throughout the day. Valero staff had to stop the movement of road tanker wagons to or from the site between the hours of 07:40 hrs and 20:30 hrs. My understanding is that up to twenty two persons were arrested by the Police before Valero were able to receive road tanker traffic and resume normal supplies of fuel.
    Sunday 3rd April 2022
    6.6.1 Protestors obstructed the same entrance point to the private shared access road leading from Trinity Road. The obstructions started at around 02:00 hrs and continued until 17:27 hrs. There was reduced access for road tankers whilst Police completed the removal and arrest of the protestors.
    Tuesday 5th April 2022
    6.6.2 Disruption started at 04:49 hrs. Approximately twenty protestors blocked the same entrance point to the private shared access road from Trinity Road. They were reported to have used adhesive to glue themselves to the road surface or used equipment to lock themselves together. Police attended and I understand that eight persons were arrested. Road tanker movements at Valero were halted between 04:49 hrs and 10:50 hrs that day.
    Thursday 7th April 2022
    6.6.3 This was a day of major disruption. At around 00:30 hrs the Valero Terminal Operator initiated an Emergency Shut Down having identified intruders on CCTV within the perimeter of the site. Five video files have been downloaded from the CCTV system showing a group of about fifteen trespassers approaching the rear of the Kingsbury
    Terminal across the railway lines. The majority appear to climb over the palisade fencing into the Kingsbury Terminal whilst several others appear to have gained access by cutting mesh fencing on the border with WOSL. There is then footage of protestors in different areas of the site including footage at 00:43 hrs of one intruder walking across the loading bay holding up what appears to be a mobile phone in front of him, clearly contravening site safety rules. He then climbed onto a stationary road tanker on the loading bay. There is clear footage of several others sitting in an elevated position in the pipe rack adjacent to the loading bay. I am also aware that Valero staff reported that two persons climbed the staircase to sit on top of one of the gas oil storage tanks and four others were found having climbed the staircase to sit on the roof of a gasoline storage tank. Police attended and spent much of the day removing protestors from the site enabling it to reopen at 18:00 hrs. There is CCTV footage of one or more persons being removed from top of the stationary road tanker wagon on the loading bays.
    6.6.4 The shutdown of more than seventeen hours caused major disruption to road tanker movements that day as customers were unable to access the site.
    Saturday 9th April 2022
    6.6.5 Protest activity occurred involving several persons around the entrance to the private access road. I believe that Police made three arrests and there was little or no disruption to road tanker movements.
    Sunday 10th April 2022
    6.6.6 A caravan was left parked on the side of the road on Piccadilly way, between the roundabout junction with the A51 and the entrance to the Shell fuel terminal. Police detained a small group of protestors with the caravan including one who remained within a tunnel that had been excavated under the road. It appeared to be an attempt to cause a closure of one of the two routes leading to the oil terminals.
    6.6.7 By 16:00 hrs police responded to two road tankers that were stranded on Trinity Road, approximately 900 metres north of the entrance to the private access road. Protestors had climbed onto the tankers preventing them from being driven any further, causing an obstruction on the second access route into the oil terminals.
    6.6.8 The Police managed to remove the protestors on top of the road tankers but 18:00 hrs and I understand that the individual within the tunnel on Piccadilly Way was removed shortly after.
    6.6.9 I understand that the Police made twenty-two arrests on the approach roads to the fuel terminals throughout the day. The road tanker wagons still managed to enter and leave the Valero site during the day taking whichever route was open at the time. This inevitably meant that some vehicles could not take their preferred route but could at least collect fuel as required. I was subsequently informed that a structural survey was quickly completed on the road tunnel and deemed safe to backfill without the need for further road closure.
    Friday 15th April 2022
    6.6.10 This was another day of major disruption. At 04:25 hrs the Valero operator initiated an emergency shutdown. The events were captured on seventeen video files recording imagery from two CCTV cameras within the site between 04:20 hrs and 15:45 hrs that day.
    6.6.11 At 04:25 a group of about ten protestors approached the emergency access gate which is located on the northern corner of the site, opening out onto Trinity Road, 600 metres north of the entrance to the shared private access road. They were all on foot and could be seen carrying ladders. Two ladders were used to climb up the outside of the
    emergency gate and then another two ladders were passed over to provide a means of climbing down inside the Valero site. Seven persons managed to climb over before a police vehicle pulled up alongside the gate. The seven then dispersed into the Kingsbury Terminal.
    6.6.12 The video footage captures the group of four males and three females sitting for several hours on the pipe rack, with two of them (one male and one female) making their way up onto the roof of the loading bay area nearby. The two on the roof sat closely together whilst the male undressed and sat naked for a considerable time sunbathing. The video footage concludes with footage of Police and the Fire and Rescue service working together to remove the two individuals.
    6.6.13 The Valero terminal remained closed between 04:30 hrs and 16:00 hrs that day causing major disruption to fuel collections. The protestors breached the site's safety rules and the emergency services needed to use a 'Cherry Picker' (hydraulic platform) during their removal. There were also concerns that the roof panels would not withstand the weight of the two persons sitting on it.
    6.6.14 I understand that Police made thirteen arrests in or around Valero and the other fuel terminals that day and had to request 'mutual aid' from neighbouring police forces.
    Tuesday 26th April 2022
    6.6.15 I was informed that approximately twelve protestors arrived outside the Kingsbury Terminal at about 07:30 hrs, increasing to about twenty by 09:30 hrs. Initially they engaged in a peaceful non obstructive protest but by 10:00 hrs had blocked the entrance to the private access road by sitting across it. Police then made a number of arrests and the obstructions were cleared by 10:40 hrs. On this occasion there was minimal disruption to the Valero site.
    Wednesday 27th April 2022
    6.6.16 At about 16:00 hrs a group of about ten protestors were arrested whilst attempting to block the entrance to the shared private access road.
    Thursday 28th April 2022
    6.6.17 At about 12:40 hrs a similar protest took place involving a group of about eight persons attempting to block the entrance to the shared private access road. The police arrested them and opened the access by 13:10 hrs.
    Wednesday 4th May 2022
    6.6.18 At about 13:30 hrs twelve protestors assembled at the entrance to the shared private access road without incident. I was informed that by 15:49 hrs Police had arrested ten individuals who had attempted to block the access.
    Thursday 12th May 2022
    6.6.19 At 13:30 hrs eight persons peacefully protested at the entrance to the private access road. By 14:20 hrs the numbers increased to eleven. The activity continued until 20:15 hrs by which time Police made several arrests of persons causing obstructions. I have retained images of the obstructions that were taken during the protest.
    Monday 22nd August 2022
    6.6.20 Contractors clearing undergrowth alerted Police to suspicious activity involving three persons who were on land between Trinity Road and the railway tracks which lead to the rear of the Valero and WOSL terminals. The location is about 1.5 km from the entrance to the shared private access road to the Kingsbury Terminal. A police dog handler attended and arrested two of the persons with the third making off. Three tunnels were found close to a tent that the three were believed to be sleeping in. The tunnels started on the roadside embankment and two of them clearly went under the road. The entrances were carefully prepared and concealed in the undergrowth. Police agreed that they were 'lock in' positions for protestors intending to cause a road closure along one of the two approach roads to the oil terminals. The road was closed awaiting structural survey. I have retained a collection of the images taken by my staff at the scene.
    Tuesday 23rd August 2022
    6.6.21 During the morning protestors obstructed a tanker in Trinity Road, approximately 1km from the Valero Terminal. There was also an obstruction of the highway close to the Shell terminal entrance on Piccadilly Way. I understand that both incidents led to arrests and a temporary blockage for road tankers trying to access the Valero site. Later that afternoon another tunnel was discovered under the road on Trinity Way, between the roundabout of the A51 and the Shell terminal. It was reported that protestors had locked themselves into positions within the tunnel. Police were forced to close the road meaning that all road tanker traffic into the Kingsbury Terminal had to approach via Trinity road and the north. It then became clear that the tunnels found on Trinity Road the previous day had been scheduled for use at the same time to create a total closure of the two routes into the fuel terminals.
    6.6.22 The closure of Piccadilly Way continued for another two days whilst protestors were removed and remediation work was completed to fill in the tunnels.
    Wednesday 14th September 2022
    6.6.23 There was serious disruption to the Valero Terminal after protestors blocked the entrance to the private access road. I believe that Police made fifty one arrests before the area was cleared to allow road tankers to access the terminal.
    6.6.24 Tanker movements were halted for just over seven hours between mid-day and 19:00 hrs. On Saturday 16th July and Sunday 17th July 2022, the group known as Extinction Rebellion staged a protest in Plymouth city centre. The protest was planned and disclosed to the police in advance and included a march of about two hundred people from the city centre down to the entrance to the Valero Plymouth Terminal in Oakfield Terrace Rd. The access to the terminal was blocked for about two hours. Road tanker movements were re-scheduled in advance minimising any disruption to fuel supplies."

    I note that the events of 16th July 2022 are out of chronological order.

  42. In his 5th witness statement the main threats identified by Mr Blackhouse were; (1) protesters directly entering the 8 Sites. He stated there had been serious incidents in the past in which protestors forcibly gained access by cutting through mesh border fencing or climbing over fencing and then carrying out dangerous activities such as climbing and sitting on top of storage tanks containing highly flammable fuel and vapour. He warned that the risk of fire for explosion at the 8 Sites is high due to the millions of litres of flammable liquid and gas stored at each. Mobile phones and lighters are heavily controlled or prohibited. (2) He warned that any activity which blocked or restricted access roads would be likely to create a situation where the Claimants were forced to take action to reduce the health and safety risks relating to emergency access which might include evacuating the sites or shutting some activity on the sites.
  43. Mr. Blackhouse warned of the knock-on effects of the Claimants having to manage protester activity to mitigate potential health and safety risks which would impact on the general public. If activity on the 8 Sites is reduced or prevented due to protester activity this would reduce the level of fuel produced, stored and transported, which would ultimately result in shortages at filling station forecourts, potentially panic buying and the adverse effects thereof. He referred to the panic buying that occurred in September 2021. Mr Blackhouse described the various refineries and terminals and the businesses carried on there. He also described the access roads to the sites. He described the substantial number of staff accessing the sites and the substantial number of tanker movements per day accessing refineries. He also described the substantial number of ship movements to and from the jetties per annum. He warned of the dangers of blocking emergency services getting access to the 8 Sites. He stated that if access roads at the 8 Sites were blocked the Claimants would have no option but to cease operations and shut down the refineries to ensure compliance with health and safety risk assessments. He informed the Court that one of the most hazardous times at the refineries was when restarting the processes after a shut down. The temperatures and pressures in the refinery are high and during restarting there is a higher probability of a leak and resultant explosions. Accordingly, the Claimants seek to limit shutdown and restart activity as much as possible. Generally, these only happen every four or five years under strictly controlled conditions.
  44. Mr. Blackhouse referred to an incident in 2019 when Extinction Rebellion targeted the Pembroke oil refinery and jetties by blocking the access roads. He warned that slow walking and blocking access roads remained a real risk and a health and safety concern. He also informed the Court that local police at this refinery took a substantial time to deal with protesters due to locking on and climbing in, resulting in significant delay. He further evidenced this by reference to the Kingsbury terminal protest in 2022.
  45. Mr. Blackhouse asserted that all of the 8 Sites are classified as "Critical National Infrastructure". The Claimants liaise closely with the National Protective Security Authority and the National Crime Agency and the Counter Terrorism Security Advisor Service of the police. Secret reports received from those agencies evidenced continuing potential activity by the 4 Organisations. In addition, on the 8th of July 2023 Extinction Rebellion stickers were placed on a sign at the refinery.
  46. Overall Mr. Blackhouse asserted that the deterrent effect of the injunctions granted has diminished the protest activity at the 8 Sites but warned that it was clear that at least some of the 4 Organisations maintained an ongoing campaign of protest activity throughout the UK. He asserted it was critical that the injunctive relief remained in place for the protection of the Claimants' employees, visitors to the sites, the public in surrounding areas and the protesters themselves.
  47. David McLoughlin. Mr McLoughlin is a director employed by the Valero group responsible for pipeline and terminals. His responsibilities include directing operations and logistics across all of the 8 Sites.
  48. He warned the Court that blocking access to the 8 Sites would have potentially very serious health and safety and environmental consequences and would cause significant business disruption. He described how under the Control of Major Accidents Hazards Involving Dangerous Substances Regulations 2015 the 8 Sites are categorised according to the risks they present which relate directly to the quantity of dangerous substances held on each site. Heavy responsibilities are placed upon the Claimants to manage their activities in a way so as to minimise the risk to employees, visitors and the general public and to prevent major accidents. The Claimants are required to carry out health and safety executive guided risk assessments which involve ensuring emergency services can quickly access the 8 Sites and to ensure appropriate manning. He warned that there were known safety risks of causing fires and explosions from lighters, mobile phones, key fobs and acrylic clothing. The risks are higher around the storage tanks and loading gantries which seemed to be favoured by protestors. He warned that the Plymouth and Manchester sites were within easy reach of large populations which created a risk to the public. He warned that blocking access roads to the 8 Sites would give rise to a potential risk of breaching the 2015 Regulations which would be both dangerous and a criminal offence. Additionally blocking access would lead to a build-up of tankers containing fuel which themselves posed a risk. He warned of the potential knock-on effects of an access road blockade on the supply chain for in excess of 700 filling stations and to the inward supply chain from tankers. He warned of the 1-2 day filling station tank capacity which needed constant and regular supply from the Claimants' sites. He also warned about the disruption to commercial contracts which would be caused by disruption to the 8 Sites. He set out details of the various sites and their access roads. He referred to the July 2022 protest at the Plymouth terminal site and pointed out the deterrent effect of the injunction, which was in place at that time, had been real and had reduced the risk.
  49. Emma Pinkerton. Miss Pinkerton has provided 5 witness statements in these proceedings, the last one dated December 2023. She is a partner at CMS Cameron McKenna Nabarro Olswang LLP.
  50. In her 3rd statement she set out details relating to the interlocutory course of the proceedings and service and necessary changes to various interim orders made.
  51. In her last witness statement she gave evidence that the Claimants do not seek to prevent protesters from undertaking peaceful lawful protests. She asserted that the Defendants had no real prospect of successfully defending the claim and pointed out that no Acknowledgments of Service or Defences had been served. She set out the chronology of the action and service of proceedings. She dealt with various errors in the orders made. She summarised that 43 undertakings had been taken from Defendants. She pointed out that there were errors in the naming of some Defendants. Miss Pinkerton summarised the continuing threat pointing out that the Just Stop Oil Twitter feed contained a statement dated 9th June 2023 setting out that the writer explained to Just Stop Oil connected readers that the injunctions banned people from taking action at refineries, distribution hubs and petrol stations and that the punishments for breaking injunctions ranged from unlimited fines to imprisonment. She asserted that the Claimants' interim injunctions in combination with those obtained by Warwickshire Borough Council had significantly reduced protest activity at the Kingsbury site.
  52. Miss Pinkerton provided a helpful summary of incidents since June 2023. On the 26th of June 2023 Just Stop Oil protesters carried out four separate slow marches across London impacting access on King's College Hospital. On the 3rd of July 2023 protesters connected with Extinction Rebellion protested outside the offices of Wood Group in Aberdeen and Surrey letting off flares and spraying fake oil across the entrance in Surrey. On 10th July 2023 several marches took place across London. On the 20th of July 2023 supporters of Just Stop Oil threw orange paint over the headquarters of Exxon Mobile. On the 1st of August 2023 protesters connected with Just Stop Oil marched through Cambridge City centre. On the 13th of August 2023 protesters connected with Money Rebellion (which may be associated with Extinction Rebellion) set off flares at the AIG Women's Open in Tadworth. On the 18th of August 2023 protesters associated with Just Stop Oil carried out a slow march in Wells, Somerset and the next day a similar march took place in Exeter City centre. On the 26th of August 2023 a similar march took place in Leeds. On the 2nd of September 2023 protesters associated with Extinction Rebellion protested outside the London headquarters of Perenco, an oil and gas company. On the 9th of September 2023 there was a slow march by protesters connected with Just Stop Oil in Portsmouth City centre. On the 18th of September 2023 protesters connected with Extinction Rebellion poured fake oil over the steps of the Labour Party headquarters and climbed the building letting off smoke grenades and one protester locked on to a handrail. On the 1st of October 2023 protesters connected with Extinction Rebellion protested in Durham. On the 10th of October 2023 protesters connected with Just Stop Oil sprayed orange paint over the Radcliffe Camera library building in Oxford and the facade of the forum at Exeter University. On the 11th of October 2023 protesters connected with Just Stop Oil sprayed orange paint over parts of Falmouth University. On the 17th of October 2023 various protesters were arrested in connection with the Energy Intelligence forum in London. On the 19th of October 2023 protests took place in Canary Wharf targeting financial businesses allegedly supporting fossil fuels and insurance companies in the City of London. On the 30th of October 2023 60 protesters were arrested for slow marching outside Parliament. On the 10th of November 2023 protesters connected with Extinction Rebellion occupied the offices of the Daily Telegraph. On the 12th of November 2023 protesters connected with Just Stop Oil marched in Holloway Road in London. On the 13th of November 2023 protesters connected with Just Stop Oil marched from Hendon Way leading to a number of arrests. On the 14th of November 2023 protesters connected with Just Stop Oil marched from Kennington Park Rd. On the same day the Metropolitan Police warned that the costs of policing such daily marches was becoming unsustainable to the public purse. On the 15th of November 2023 protesters connected with Just Stop Oil marched down the Cromwell Road and 66 were arrested. On the 18th of November 2023 protestors connected with Just Stop Oil and Extinction Rebellion protested outside the headquarters of Shell in London and some arrests were made. On the 20th of November 2023 protesters connected with Just Stop Oil gathered in Trafalgar Square and started to march and some arrests were made. On the 30th of November 2023 protesters connected with Just Stop Oil gathered in Kensington in London and 16 were arrested.
  53. Miss Pinkerton extracted some quotes from the Just Stop Oil press releases including assertions that their campaign would be "indefinite" until the Government agreed to stop new fossil fuel projects in the UK and mentioning their supporters storming the pitch at Twickenham during the Gallagher Premiership Rugby final. Further press releases in June and July 2023 encouraging civil resistance against oil, gas and coal were published. In an open letter to the police unions dated 13th September 2023 Just Stop Oil stated they would be back on the streets from October the 29th for a resumption after their 13 week campaign between April and July 2023 which they asserted had already cost the Metropolitan Police more than £7.7 million and required the equivalent of an extra 23,500 officer shifts.
  54. Miss Pinkerton also examined the Extinction Rebellion press statements which included advice to members of the public to picket, organise locally, disobey and asserted that civil disobedience works. On the 30th of October 2023 a spokesperson for Just Stop Oil told the Guardian newspaper that the organisation supporters were willing to slow march to the point of arrest every day until the police took action to prosecute the real criminals who were facilitating new oil and gas extraction.
  55. Miss Pinkerton summarised the various applications for injunctions made by Esso Oil, Stanlow Terminals Limited, Infranorth Limited, North Warwickshire Borough Council, Esso Petroleum, Exxon Mobile Chemical Limited, Thurrock Council, Essex Council, Shell International, Shell UK, UK Oil Pipelines, West London Pipeline and Storage, Exolum Pipeline Systems, Exolum Storage, Exolum Seal Sands and Navigator Terminals.
  56. Miss Pinkerton asserted that the Claimants had given full and frank disclosure as required by the Supreme Court in Wolverhampton v London Gypsies (citation below). In summary she asserted that the Claimants remained very concerned that protest groups including the 4 Organisations would undertake disruptive, direct action by trespass or blocking access to the 8 Sites and that a final injunction was necessary to prevent future tortious behaviour.
  57. Previous decision on the relevant facts

  58. In North Warwickshire v Baldwin and 158 others and PUs [2023] EWHC 1719, Sweeting J gave judgment in relation to a claim brought by North Warwickshire council against 159 named defendants relating to the Kingsbury terminal which is operated by Shell, Oil Pipelines Limited, Warwickshire Oil Storage Limited and Valero Energy Ltd. Findings of fact were made in that judgment about the events in March and April 2022 which are relevant to my judgment. Sweeting J. found that protests began at Kingsbury during March 2022 and were characterised by protesters glueing themselves to roads accessing the terminal; breaking into the terminal compounds by cutting through gates and trespassing; climbing onto storage tanks containing unleaded petrol, diesel and fuel additives; using mobile phones within the terminal to take video films of their activities while standing on top of oil tankers and storage tanks and next to fuel transfer equipment; interfering with oil tankers by climbing onto them and fixing themselves to the roofs thereof; letting air out of the tyres of tankers; obstructing the highways accessing the terminal generally and climbing equipment and abseiling from a road bridge into the terminal. In relation to the 7th of April Sweeting J found that at 12:30 (past midnight) a group of protesters approached one of the main terminal entrances and attempted to glue themselves to the road. When the police were deployed a group of protesters approached the same enclosure from the fields to the rear and used a saw to break through an exterior gate and scaled fences to gain access. Once inside they locked themselves onto a number of different fixtures including the top of three large fuel storage tanks containing petrol diesel and fuel additives and the tops of two fuel tankers and the floating roof of a large fuel storage tank. The floating roof floated on the surface of stored liquid hydrocarbons. Sweeting J found that the ignition of liquid fuel or vapour in such a storage tank was an obvious source of risk to life. On the 9th of April 2022 protesters placed a caravan at the side of the road called Piccadilly Way which is an access road to the terminal and protesters glued themselves to the sides and top of the caravan whilst others attempted to dig a tunnel under the road through a false floor in the caravan. That was a road used by heavily laden oil tankers to and from the terminal and the collapse of the road due to a tunnel caused by a tanker passing over it was identified by Sweeting J as including the risk of injury and road damage and the escape of fuel fluid into the soil of the environment.
  59. Assessment of lay witnesses

  60. I decide all facts in this hearing on the balance of probabilities. I have not seen any witness give live evidence. None were required for cross-examination by the Defendants. None were challenged. I take that into account.
  61. Having carefully read the statements I accept the evidence put before me from the Claimants' witnesses. I have not found sloppiness, internal inconsistency or exaggeration in the way they were written or any reason to doubt the evidence provided.
  62. The Law

    Summary Judgment

  63. Under CPR part 24 it is the first task of this Court to determine whether the Defendants have a realistic prospect of success in defending the claim. Realistic is distinguished from a fanciful prospect of success, see Swain v Hillman [2001] 1 ALL ER 91. The threshold for what is a realistic prospect was examined in ED and F Man Liquid Products v Patel [2003] EWCA Civ 472. It is higher than a merely arguable prospect of success. Whilst it is clear that on a summary judgement application the Court is not required to effect a mini trial, it does need to analyse the evidence put before it to determine whether it is worthless, contradictory, unimpressive or incredible and overall to determine whether it is credible and worthy of acceptance. The Court is also required to take into account, in a claim against PUs, not only the evidence put before it on the application but also the evidence which could reasonably be expected to be available at trial both on behalf of the Claimants and the Defendants, see Royal Brompton Hospitals v Hammond (#5) [2001] EWCA Civ 550. Where reasonable grounds exist for believing that a fuller investigation of the facts of the case at trial would affect the outcome of the decision then summary judgement should be refused, see Doncaster Pharmaceuticals v Bolton Pharmaceutical Co [2007] F.S.R 3. I take into account that the burden of proof rests in the first place on the applicant and also the guidance given in Sainsbury's Supermarkets v Condek Holdings [2014] EWHC 2016, at paragraph 13, that if the applicant has produced credible evidence in support of the assertion that the applicant has a realistic prospect of success on the claim, then the respondent is required to prove some real prospect of success in defending the claim or some other substantial reason for the claim going to trial. I also take into account the guidance given at paragraph 40 of the judgment of Sir Julian Flaux in the Court of Appeal in National Highways Limited v Persons Unknown [2023] EWCA Civ 182, that the test to be applied when a final anticipatory injunction is sought through a summary judgment application is the same as in all other cases.
  64. CPR part 24 r.24.5 states that if a respondent to a summary judgment application wishes to put in evidence he "must" file and serve written evidence 7 days before the hearing. Of course, this cannot apply to PUs who will have no knowledge of the hearing. It does apply to named and served Defendants.
  65. But what approach should the Court take where named Defendant served nothing and PUs are also Defendants? In King v Stiefel [2021] EWHC 1045 (Comm) Cockerill J. ruled as follows on what to do in relation to evidence:
  66. "21. The authorities therefore make clear that in the context of summary judgment the court is by no means barred from evaluating the evidence, and concluding that on the evidence there is no real (as opposed to fanciful) prospect of success. It will of course be cautious in doing so. It will bear in mind the clarity of the evidence available and the potential for other evidence to be available at trial which is likely to bear on the issues. It will avoid conducting a mini-trial. But there will be cases where the court will be entitled to draw a line and say that - even bearing well in mind all of those points - it would be contrary to principle for a case to proceed to trial.
    22. So, when faced with a summary judgment application it is not enough to say, with Mr Micawber, that something may turn up . . ."

  67. In my judgment, in a case such as this, where named Defendants have taken no part and where other Defendants are PUs, the safest course is to follow the guidance of the Supreme Court and treat the hearing as ex-parte and to consider the defences which the PUs could run.
  68. Final Injunctions

  69. The power of this Court to grant an injunction is set out in S.37 of the Senior Courts Act 1981. The relevant sections follow:
  70. "37 Powers of High Court with respect to injunctions ….
    (1) The High Court may by order (whether interlocutory or final) grant an injunction … in all cases in which it appears to the court to be just and convenient to do so.
    (2) Any such order may be made either unconditionally or on such terms and conditions as the court thinks just."

  71. An injunction is a discretionary remedy which can be enforced through contempt proceedings. There are two types, mandatory and prohibitory. I am only dealing with an application for the latter type and only on the basis of quia timet – which is the fear of the Claimants that an actionable wrong will be committed against them. Whilst the balance of convenience test was initially developed for interim injunctions it developed such that it is generally used in the granting of final relief. I shall refer below to how it is refined in PU cases.
  72. In law a landowner whose title is not disputed is prima facie entitled to an injunction to restrain a threatened or apprehended trespass on his land: see Snell's Equity (34th ed) at para 18-012. In relation to quia timet injunctions, like the one sought in this case, the Claimants must prove that there is a real and imminent risk of the Defendant causing the torts feared, not that the torts have already been committed, per Longmore LJ in Ineos Upstream v Boyd [2019] 4 WLR 100, para 34(1). I also take account of the judgment of Sir Julian Flaux in National Highways v PUs [2023] 1 WLR 2088, in which at paras. 37-40 the following ruling was provided:
  73. "37. Although the judge did correctly identify the test for the grant of an anticipatory injunction, in para 38 of his judgment, unfortunately he fell into error in considering the question whether the injunction granted should be final or interim. His error was in making the assumption that before summary judgment for a final anticipatory injunction could be granted NHL had to demonstrate, in relation to each defendant, that that defendant had committed the tort of trespass or nuisance and that there was no defence to a claim that such a tort had been committed. That error infected both his approach as to whether a final anticipatory injunction should be granted and as to whether summary judgment should be granted.
    38. As regards the former, it is not a necessary criterion for the grant of an anticipatory injunction, whether final or interim, that the defendant should have already committed the relevant tort which is threatened. Vastint [2019] 4 WLR 2 was a case where a final injunction was sought and no distinction is drawn in the authorities between a final prohibitory anticipatory injunction and an interim prohibitory anticipatory injunction in terms of the test to be satisfied. Marcus Smith J summarises at para 31(1) the effect of authorities which do draw a distinction between final prohibitory injunctions and final mandatory injunctions, but that distinction is of no relevance in the present case, which is only concerned with prohibitory injunctions.
    39. There is certainly no requirement for the grant of a final anticipatory
    injunction that the claimant prove that the relevant tort has already been
    committed. The essence of this form of injunction, whether interim or final, is that the tort is threatened and, as the passage from Vastint at para 31(2) quoted at para 27 above makes clear, for some reason the claimant's cause of action is not complete. It follows that the judge fell into error in concluding, at para 35 of the judgment, that he could not grant summary judgment for a final anticipatory injunction against any named defendant unless he was satisfied that particular defendant had committed the relevant tort of trespass or nuisance.
    40. The test which the judge should have applied in determining whether to grant summary judgment for a final anticipatory injunction was the standard test under CPR r 24.2, namely, whether the defendants had no real prospect of successfully defending the claim. In applying that test, the fact that (apart from the three named defendants to whom we have referred) none of the defendants served a defence or any evidence or otherwise engaged with the proceedings, despite being given ample opportunity to do so, was not, as the judge thought, irrelevant, but of considerable relevance, since it supported NHL's case that the defendants had no real prospect of successfully defending the claim for an injunction at trial."

  74. In relation to the substantive and procedural requirements for the granting of an injunction against persons unknown, guidance was given in Canada Goose v Persons Unknown [2021] WLR 2802, by the Court of Appeal. In a joint judgment Sir Terence Etherton and Lord Justices Richards and Coulson ruled as follows:
  75. "82 Building on Cameron [2019] 1 WLR 1471 and the Ineos requirements, it is now possible to set out the following procedural guidelines applicable to proceedings for interim relief against "persons unknown" in protestor cases like the present one:
    (1) The "persons unknown" defendants in the claim form are, by definition, people who have not been identified at the time of the commencement of the proceedings. If they are known and have been identified, they must be joined as individual defendants to the proceedings. The "persons unknown" defendants must be people who have not been identified but are capable of being identified and served with the proceedings, if necessary by alternative service such as can reasonably be expected to bring the proceedings to their attention. In principle, such persons include both anonymous defendants who are identifiable at the time the proceedings commence but whose names are unknown and also Newcomers, that is to say people who in the future
    will join the protest and fall within the description of the "persons unknown".
    (2) The "persons unknown" must be defined in the originating process by reference to their conduct which is alleged to be unlawful.
    (3) Interim injunctive relief may only be granted if there is a sufficiently
    real and imminent risk of a tort being committed to justify quia timet relief.
    (4) As in the case of the originating process itself, the defendants subject to the interim injunction must be individually named if known and identified or, if not and described as "persons unknown", must be capable of being identified and served with the order, if necessary by alternative service, the method of which must be set out in the order.
    (5) The prohibited acts must correspond to the threatened tort. They may include lawful conduct if, and only to the extent that, there is no other proportionate means of protecting the claimant's rights.
    (6) The terms of the injunction must be sufficiently clear and precise as to enable persons potentially affected to know what they must not do. The prohibited acts must not, therefore, be described in terms of a legal cause of action, such as trespass or harassment or nuisance. They may be defined by reference to the defendant's intention if that is strictly necessary to correspond to the threatened tort and done in non-technical language which a defendant is capable of understanding and the intention is capable of proof without undue complexity. It is better practice, however, to formulate the injunction without reference to intention if the prohibited tortious act can be described in ordinary language without doing so.
    (7) The interim injunction should have clear geographical and temporal
    limits. It must be time limited because it is an interim and not a final injunction. We shall elaborate this point when addressing Canada Goose's application for a final injunction on its summary judgment application."
  76. I also take into account the guidance and the rulings made by the Supreme Court in Wolverhampton City Council v London Gypsies [2023] UKSC 47; [2024] 2 WLR 45 on final injunctions against PUs. This was a case involving a final injunction against unknown gypsies and travellers. The circumstances were different from protester cases because Local Authorities have duties in relation to travellers. In their joint judgment the Supreme Court ruled as follows:
  77. "167. These considerations lead us to the conclusion that, although the attempts thus far to justify them are in many respects unsatisfactory, there is no immoveable obstacle in the way of granting injunctions against newcomer Travellers, on an essentially without notice basis, regardless of whether in form interim or final, either in terms of jurisdiction or principle. But this by no means leads straight to the conclusion that they ought to be granted, either generally or on the facts of any particular case. They are only likely to be justified as a novel exercise of an equitable discretionary power if:
    (i) There is a compelling need, sufficiently demonstrated by the evidence, for the protection of civil rights (or, as the case may be, the enforcement of planning control, the prevention of anti-social behaviour, or such other statutory objective as may be relied upon) in the locality which is not adequately met by any other measures available to the applicant local authorities (including the making of byelaws). This is a condition which would need to be met on the particular facts about unlawful Traveller activity within the applicant local authority's boundaries.
    (ii) There is procedural protection for the rights (including Convention
    rights) of the affected newcomers, sufficient to overcome the strong prima facie objection of subjecting them to a without notice injunction otherwise than as an emergency measure to hold the ring. This will need to include an obligation to take all reasonable steps to draw the application and any order made to the attention of all those likely to be affected by it (see paras 226—231 below); and the most generous provision for liberty (ie permission) to apply to have the injunction varied or set aside, and on terms that the grant of the injunction in the meantime does not foreclose any objection of law, practice, justice or convenience which the newcomer so applying might wish to raise.
    (iii) Applicant local authorities can be seen and trusted to comply with the most stringent form of disclosure duty on making an application, so as both to research for and then present to the court everything that might have been said by the targeted newcomers against the grant of injunctive relief.
    (iv) The injunctions are constrained by both territorial and temporal limitations so as to ensure, as far as practicable, that they neither outflank nor outlast the compelling circumstances relied upon.
    (v) It is, on the particular facts, just and convenient that such an injunction be granted. …"
    "5. The process of application for, grant and monitoring of newcomer injunctions and protection for newcomers' rights
    187. We turn now to consider the practical application of the principles affecting an application for a newcomer injunction against Gypsies and Travellers, and the safeguards that should accompany the making of such an order. As we have mentioned, these are matters to which judges hearing such applications have given a good deal of attention, as has the Court of Appeal in considering appeals against the orders they have made. Further, the relevant principles and safeguards will inevitably evolve in these and other cases in the light of experience. Nevertheless, they do have a bearing on the issues of principle we have to decide, in that we must be satisfied that the points raised by the appellants do not, individually or collectively, preclude the grant of what are in some ways final (but regularly reviewable) injunctions that prevent persons who are unknown and unidentifiable at the date of the order from trespassing on and occupying local authority land. We have also been invited to give guidance on these matters so far as we feel able to do so having regard to our conclusions as to the nature of newcomer injunctions and the principles applicable to their grant.
    Compelling justification for the remedy
    188. Any applicant for the grant of an injunction against newcomers in a Gypsy and Traveller case must satisfy the court by detailed evidence that there is a compelling justification for the order sought. This is an overarching principle that must guide the court at all stages of its consideration (see para 167(i))."
    "(viii) A need for review
    (2) Evidence of threat of abusive trespass or planning breach
    218. We now turn to more general matters and safeguards. As we have foreshadowed, any local authority applying for an injunction against persons unknown, including newcomers, in Gypsy and Traveller cases must satisfy the court by full and detailed evidence that there is a compelling justification for the order sought (see para 167(i) above). There must be a strong probability that a tort or breach of planning control or other aspect of public law is to be committed and that this will cause real harm. Further, the threat must be real and imminent. We have no doubt that local authorities are well equipped to prepare this evidence, supported by copies of all relevant documents, just as they have shown themselves to be in making applications for injunctions in this area for very many years.
    219. The full disclosure duty is of the greatest importance (see para 167(iii)). We consider that the relevant authority must make full disclosure to the court not just of all the facts and matters upon which it
    relies but also and importantly, full disclosure of all facts, matters and arguments of which, after reasonable research, it is aware or could with reasonable diligence ascertain and which might affect the decision of the court whether to grant, maintain or discharge the order in issue, or the terms of the order it is prepared to make or maintain. This is a continuing obligation on any local authority seeking or securing such an order, and it is one it must fulfil having regard to the one-sided nature of the application and the substance of the relief sought. Where relevant information is discovered after the making of the order the local authority may have to put the matter back before the court on a further application.
    220. The evidence in support of the application must therefore err on the side of caution; and the court, not the local authority, should be the judge of relevance.
    (3) Identification or other definition of the intended respondents to the application
    221. The actual or intended respondents to the application must be defined as precisely as possible. In so far as it is possible actually to identify persons to whom the order is directed (and who will be enjoined by its terms) by name or in some other way, as Lord Sumption explained in Cameron [2019] 1 WLR 1471, the local authority ought to do so. The fact that a precautionary injunction is also sought against newcomers or other persons unknown is not of itself a justification for failing properly to identify these persons when it is possible to do so, and serving them with the proceedings and order, if necessary, by seeking an order for substituted service. It is only permissible to seek or maintain an order directed to newcomers or other persons unknown where it is impossible to name or identify them in some other and more precise way. Even where the persons sought to be subjected to the injunction are newcomers, the possibility of identifying them as a class by reference to conduct prior to what would be a breach (and, if necessary, by reference to intention) should be explored and adopted if possible.
    (1) The prohibited acts
    222. It is always important that an injunction spells out clearly and in everyday terms the full extent of the acts it prohibits, and this is particularly so where it is sought against persons unknown, including newcomers. The terms of the injunction and therefore the prohibited acts must correspond as closely as possible to the actual or threatened unlawful conduct. Further, the order should extend no further than the minimum necessary to achieve the purpose for which it was granted; and the terms of the order must be sufficiently clear and precise to enable persons affected by it to know what they must not do.
    223. Further, if and in so far as the authority seeks to enjoin any conduct which is lawful viewed on its own, this must also be made absolutely clear, and the authority must be prepared to satisfy the court that there is no other more proportionate way of protecting its rights or those of others.
    224. It follows but we would nevertheless emphasise that the prohibited acts should not be described in terms of a legal cause of action, such as trespass or nuisance, unless this is unavoidable. They should be defined, so far as possible, in non-technical and readily comprehensible language which a person served with or given notice of the order is capable of understanding without recourse to professional legal advisers.
    (5) Geographical and temporal limits
    225. The need for strict temporal and territorial limits is another important consideration (see para 167(iv)). One of the more controversial aspects of many of the injunctions granted hitherto has been their duration and geographical scope. These have been subjected to serious criticism, at least some of which we consider to be justified. We have considerable doubt as to whether it could ever be justifiable to grant a Gypsy or Traveller injunction which is directed to persons unknown, including newcomers, and extends over the whole of a borough or for significantly more than a year. It is to be remembered that this is an exceptional remedy, and it must be a proportionate response to the unlawful activity to which it is directed. Further, we consider that an injunction which extends borough-wide is likely to leave the Gypsy and Traveller communities with little or no room for manoeuvre, just as Coulson LJ warned might well be the case (see generally, Bromley [2020] PTSR 1043, paras 99—109. Similarly, injunctions of this kind must be reviewed periodically (as Sir Geoffrey Vos MR explained in these appeals at paras 89 and 108) and in our view ought to come to an end (subject to any order of the judge), by effluxion of time in all cases after no more than a year unless an application is made for their renewal. This will give all parties an opportunity to make full and complete disclosure to the court, supported by appropriate evidence, as to how effective the order has been; whether any reasons or grounds for its discharge have emerged; whether there is any proper justification for its continuance; and whether and on what basis a further order ought to be made.
    (6) Advertising the application in advance
    226. We recognise that it would be impossible for a local authority to give effective notice to all newcomers of its intention to make an application for an injunction to prevent unauthorised encampments on its land. That is the basis on which we have proceeded. On the other hand, in the interests of procedural fairness, we consider that any local authority intending to make an application of this kind must take reasonable steps to draw the application to the attention of persons likely to be affected by the injunction sought or with some other genuine and proper interest in the application (see para 167(ii) above). This should be done in sufficient time before the application is heard to allow those persons (or those representing them or their interests) to make focused submissions as to whether it is appropriate for an injunction to be granted and, if it is, as to the terms and conditions of any such relief.
    227. Here the following further points may also be relevant. First, local authorities have now developed ways to give effective notice of the grant of such injunctions to those likely to be affected by them, and they do so by the use of notices attached to the land and in other ways as we describe in the next section of this judgment. These same methods, appropriately modified, could be used to give notice of the application itself. As we have also mentioned, local authorities have been urged for some time to establish lines of communication with Traveller and Gypsy communities and those representing them, and all these lines of communication, whether using email, social media, advertisements or some other form, could be used by authorities to give notice to these communities and other interested persons and bodies of any applications they are proposing to make.
    228. Secondly, we see merit in requiring any local authority making an application of this kind to explain to the court what steps it has taken to give notice of the application to persons likely to be affected by it or to have a proper interest in it, and of all responses it has received.
    229. These are all matters for the judges hearing these applications to
    consider in light of the particular circumstances of the cases before them, and in this way to allow an appropriate practice to develop.
    (7) Effective notice of the order
    230. We are not concerned in this part of our judgment with whether respondents become party to the proceedings on service of the order upon them, but rather with the obligation on the local authority to take steps actively to draw the order to the attention of all actual and potential respondents; to give any person potentially affected by it full information as to its terms and scope, and the consequences of failing to comply with it; and how any person affected by its terms may make an application for its variation or discharge (again, see para 167(ii) above).
    231. Any applicant for such an order must in our view make full and complete disclosure of all the steps it proposes to take (i) to notify all persons likely to be affected by its terms; and (ii) to ascertain the names and addresses of all such persons who are known only by way of description. This will no doubt include placing notices in and around the relevant sites where this is practicable; placing notices on appropriate websites and in relevant publications; and giving notice to relevant community and charitable and other representative groups.
    (8) Liberty to apply to discharge or vary
    232. As we have mentioned, we consider that an order of this kind ought always to include generous liberty to any person affected by its terms to apply to vary or discharge the whole or any part of the order (again, see para 167(ii) above). This is so whether the order is interim or final in form, so that a respondent can challenge the grant of the injunction on any grounds which might have been available at the time of its grant.
    (9) Costs protection
    233. This is a difficult subject, and it is one on which we have received little assistance. We have considerable concern that costs of litigation of this kind are way beyond the means of most if not all Gypsies and Travellers and many interveners, as counsel for the first interveners, Friends of the Earth, submitted. This raises the question whether the court has jurisdiction to make a protective or costs capping order. This is a matter to be considered on another day by the judge making or continuing the order. We can see the benefit of such an order in an appropriate case to ensure that all relevant arguments are properly ventilated, and the court is equipped to give general guidance on the difficult issues to which it may give rise.
    (10) Cross-undertaking
    234. This is another important issue for another day. But a few general points may be made at this stage. It is true that this new form of injunction is not an interim order, and it is not in any sense holding the ring until the final determination of the merits of the claim at trial. Further, so far as the applicant is a public body acting in pursuance of its public duty, a cross undertaking may not in any event be appropriate. Nevertheless, there may be occasions where a cross undertaking is considered appropriate, for reasons such as those given by Warby J in Birmingham City Council v Afsar [2019] EWHC 1619 (QB), a protest case. These are matters to be considered on a case-by-case basis, and the applicant must equip the court asked to make or continue the order with the most up-to-date guidance and assistance.
    (11) Protest cases
    235. The emphasis in this discussion has been on newcomer injunctions in Gypsy and Traveller cases and nothing we have said should be taken as prescriptive in relation to newcomer injunctions in other cases, such as those directed at protesters who engage in direct action by, for example, blocking motorways, occupying motorway gantries or occupying HS2's land with the intention of disrupting construction. Each of these activities may, depending on all the circumstances, justify the grant of an injunction against persons unknown, including newcomers. Any of these persons who have notice of the order will be bound by it, just as effectively as the injunction in the proceedings the subject of this appeal has bound newcomer Gypsies and Travellers.
    236. Counsel for the Secretary of State for Transport has submitted and we accept that each of these cases has called for a full and careful assessment of the justification for the order sought, the rights which are or may be interfered with by the grant of the order, and the proportionality of that interference. Again, in so far as the applicant seeks an injunction against newcomers, the judge must be satisfied there is a compelling need for the order. Often the circumstances of these cases vary significantly one from another in terms of the range and number of people who may be affected by the making or refusal of the injunction sought; the legal right to be protected; the illegality to be prevented; and the rights of the respondents to the application. The duration and geographical scope of the injunction necessary to protect the applicant's rights in any particular case are ultimately matters for the judge having regard to the general principles we have explained."

  78. I conclude from the rulings in Wolverhampton that the 7 rulings in Canada Goose remain good law and that other factors have been added. To summarise, in summary judgment applications for a final injunction against unknown persons ("PUs") or newcomers, who are protesters of some sort, the following 13 guidelines and rules must be met for the injunction to be granted. These have been imposed because a final injunction against PUs is a nuclear option in civil law akin to a temporary piece of legislation affecting all citizens in England and Wales for the future so must be used only with due safeguards in place.
  79. (A) Substantive Requirements
  80. Cause of action

    (1) There must be a civil cause of action identified in the claim form and particulars of claim. The usual quia timet (since he fears) action relates to the fear of torts such as trespass, damage to property, private or public nuisance, tortious interference with trade contracts, conspiracy with consequential damage and on-site criminal activity.

    Full and frank disclosure by the Claimant

    (2) There must be full and frank disclosure by the Claimant (applicant) seeking the injunction against the PUs.

    Sufficient evidence to prove the claim

    (3) There must be sufficient and detailed evidence before the Court on the summary judgment application to justify the Court finding that the immediate fear is proven on the balance of probabilities and that no trial is needed to determine that issue. The way this is done is by two steps. Firstly stage (1), the claimant has to prove that the claim has a realistic prospect of success, then the burden shifts to the defendant. At stage (2) to prove that any defence has no realistic prospect of success. In PU cases where there is no defendant present, the matter is considered ex-parte by the Court. If there is no evidence served and no foreseeable realistic defence, the claimant is left with an open field for the evidence submitted by him and his realistic prospect found at stage (1) of the hearing may be upgraded to a balance of probabilities decision by the Judge. The Court does not carry out a mini trial but does carry out an analysis of the evidence to determine if it the claimant's evidence is credible and acceptable. The case law on this process is set out in more detail under the section headed "The Law" above.

    No realistic defence

    (4) The defendant must be found unable to raise a defence to the claim which has a realistic prospect of success, taking into account not only the evidence put before the Court (if any), but also, evidence that a putative PU defendant might reasonably be foreseen as able to put before the Court (for instance in relation to the PUs civil rights to freedom of speech, freedom to associate, freedom to protest and freedom to pass and repass on the highway). Whilst in National Highways the absence of any defence from the PUs was relevant to this determination, the Supreme Court's ruling in Wolverhampton enjoins this Court not to put much weight on the lack of any served defence or defence evidence in a PU case. The nature of the proceedings are "ex-parte" in PU cases and so the Court must be alive to any potential defences and the Claimants must set them out and make submissions upon them. In my judgment this is not a "Micawber" point, it is a just approach point.

    Balance of convenience – compelling justification

    (5) In interim injunction hearings, pursuant to American Cyanamid v Ethicon [1975] AC 396, for the Court to grant an interim injunction against a defendant the balance of convenience and/or justice must weigh in favour of granting the injunction. However, in PU cases, pursuant to Wolverhampton, this balance is angled against the applicant to a greater extent than is required usually, so that there must be a "compelling justification" for the injunction against PUs to protect the claimant's civil rights. In my judgment this also applies when there are PUs and named defendants.

    (6) The Court must take into account the balancing exercise required by the Supreme Court in DPP v Ziegler [2021] UKSC 23, if the PUs' rights under the European Convention on Human Rights (for instance under Articles 10(2) and 11(2)) are engaged and restricted by the proposed injunction. The injunction must be necessary and proportionate to the need to protect the Claimants' right.

    Damages not an adequate remedy

    (7) For the Court to grant a final injunction against PUs the claimant must show that damages would not be an adequate remedy.

    (B) Procedural Requirements

    Identifying PUs

    (8) The PUs must be clearly and plainly identified by reference to: (a) the tortious conduct to be prohibited (and that conduct must mirror the torts claimed in the Claim Form), and (b) clearly defined geographical boundaries, if that is possible.

    The terms of injunction

    (9) The prohibitions must be set out in clear words and should not be framed in legal technical terms (like "tortious" for instance). Further, if and in so far as it seeks to prohibit any conduct which is lawful viewed on its own, this must also be made absolutely clear and the claimant must satisfy the Court that there is no other more proportionate way of protecting its rights or those of others.

    The prohibitions must match the claim

    (10) The prohibitions in the final injunctions must mirror the torts claimed (or feared) in the Claim Form.

    Geographic boundaries

    (11) The prohibitions in the final injunctions must be defined by clear geographic boundaries, if that is possible.

    Temporal limits - duration

    (12) The duration of the final injunction should be only such as is proven to be reasonably necessary to protect the claimant's legal rights in the light of the evidence of past tortious activity and the future feared (quia timet) tortious activity.

    Service

    (13) Understanding that PUs by their nature are not identified, the proceedings, the evidence, the summary judgment application and the draft order must be served by alternative means which have been considered and sanctioned by the Court. The applicant must, under the Human Rights Act 1998 S.12(2), show that it has taken all practicable steps to notify the respondents.

    The right to set aside or vary

    (14) The PUs must be given the right to apply to set aside or vary the injunction on shortish notice.

    Review

    (15) Even a final injunction involving PUs is not totally final. Provision must be made for reviewing the injunction in the future. The regularity of the reviews depends on the circumstances. Thus such injunctions are "Quasi-final" not wholly final.

  81. Costs and undertakings may be relevant in final injunction cases but the Supreme Court did not give guidance upon these matters.
  82. I have read and take into account the cases setting out the historical growth of PU injunctions including Ineos Upstream v PUs [2019] EWCA Civ 515, per Longmore LJ at paras. 18-34. I do not consider that extracts from the judgment are necessary here.
  83. Applying the law to the facts

  84. When applying the law to the facts I take into account the interlocutory judgments of Bennathan J and Bourne J in this case. I apply the balance of probabilities. I treat the hearing as an ex-parte hearing at which the Claimants must prove their case and put forward the potential defences of the PUs and show why they have no realistic prospect of success.
  85. (A) Substantive Requirements

    Cause of action

  86. The pleaded claim is fear of trespass, crime and public and private nuisance at the 8 Sites and on the access roads thereto. In the event, as was found by Sweeting J, Bennathan J. and Bourne J. all 3 feared torts were committed in April 2022 and thereafter mainly at the Kingsbury site but also in Plymouth later on. In my judgment the claim as pleaded is sufficient on a quia timet basis.
  87. Full and frank disclosure

  88. By their approach to the hearing I consider that the Claimant and their legal team have evidenced providing full and frank disclosure.
  89. Sufficient evidence to prove the claim

  90. In my judgment the evidence shows that the Claimants have a good cause of action and fully justified fears that they face a high risk and an imminent threat that the remaining 17 named Defendants (who would not give undertakings) and/or that UPs will commit the pleaded torts of trespass and nuisance at the 8 Sites in connection with the 4 Organisations. I consider the phrase "in connection with" is broad and does not require membership of the 4 Organisations (if such exists), or proof of donation. It requires merely joining in with a protest organised by, encouraged by or at which one or more of the 4 Organisations were present or represented. The history of the invasive and dangerous protests in April 2022, despite the existence of the interim injunction made by Butcher J, is compelling. Climbing onto fuel filled tankers on access roads is a hugely dangerous activity. Invading and trespassing upon petrochemical refineries and storage facilities and climbing on storage tanks and tankers is likewise very dangerous. Tunnelling under roads to obstruct and damage fuel tankers is also a dangerous tort of nuisance. I accept the evidence of further torts committed between May and September 2022. I have carefully considered the reduction in activity against the Claimants' Sites in 2023, however the threats from the spokespersons who align themselves or speak for the 4 Organisations did not reduce. I find that the reduction or abolition of direct tortious activity against the Claimants' 8 Sites was probably a consequence of the interim injunctions which were restraining the PUs connected with the 4 Organisations and that it is probable that without the injunctions direct tortious activity would quickly have recommenced and in future would quickly recommence.
  91. No realistic defence

  92. The Defendants have not entered any appearance or defence. Utterly properly Miss Holland KC dealt with the potential defences which the Defendants could have raised in her skeleton. Those related to Articles 10 and 11 of the European Convention on Human Rights. In Cuciurean v Secretary of State for Transport [2021] EWCA 357, [9(1)]-[9(2)] (emphasis added) Warby LJ said:
  93. "9. The following general principles are well-settled, and uncontroversial on this appeal.
    (1) Peaceful protest falls within the scope of the fundamental rights of free speech and freedom of assembly guaranteed by Articles 10(1) and 11(1) of the European Convention on Human Rights and Fundamental Freedoms. Interferences with those rights can only be justified if they are necessary in a democratic society and proportionate in pursuit of one of the legitimate aims specified in Articles 10(2) and 11(2). Authoritative statements on these topics can be found in Tabernacle v Secretary of State for Defence [2009] EWCA Civ 23 [43] (Laws LJ) and City of London v Samede [2012] EWCA Civ 160 [2012] 2 All ER 1039, reflecting the Strasbourg jurisprudence.
    (2) But the right to property is also a Convention right, protected by Article 1 of the First Protocol ('A1P1'). In a democratic society, the protection of property rights is a legitimate aim, which may justify interference with the rights guaranteed by Article 10 and 11. Trespass is an interference with A1P1 rights, which in turn requires justification. In a democratic society, Articles 10 and 11 cannot normally justify a person in trespassing on land of which another has the right to possession, just because the defendant wishes to do so for the purposes of protest against government policy. Interference by trespass will rarely be a necessary and proportionate way of pursuing the right to make such a protest."
  94. I consider that any defence assertion that the final injunction amounts to a breach of the Defendants' rights under Articles 10 and 11 of the European Convention on Human Rights would be bound to fail. Trespass on the Claimants' 8 sites and criminal damage thereon is not justified by those Articles and they are irrelevant to those pleaded causes. As for private nuisance the same reasoning applies. The Articles would only be relevant to the public nuisance on the highways. The Claimants accept that those rights would be engaged on public highways. However, the injunction is prescribed by law in that it is granted by the Court. It is granted with a legitimate aim, namely to protect the Claimant's civil rights to property and access thereto, to avoid criminal damage, to avoid serious health and safety dangers, to protect the right to life of the Claimants' staff and invitees should a serious accidents occur and to enable the emergency services by enabling to access the 8 Sites. There is also a wider interest in avoiding the disruption to emergency services, schools, transport and national services from disruption in fuel supplies. In my judgment there are no less restrictive means available to achieve the aim of protecting the Claimants' civil rights and property than the terms of the final injunction. The Defendants have demonstrated that they are committed to continuing to carry out their unlawful behaviour. In my judgment an injunction in the terms sought strikes a fair balance. In particular, the Defendants' actions in seeking to compel rather than persuade the Government to act in a certain way (by attacking the Claimants 8 Sites), are not at the core of their Article 10 and 11 rights, see Attorney General's Reference (No 1 of 2022) [2023] KB 37, at para 86. I take into account that direct action is not being carried out on the highway because the highway is in some way important or related to the protest. It is a means by which the Defendants can inflict significant disruption, see National Highways Ltd v Persons Unknown [2021] EWHC 3081 (KB), at para 40(4)(a) per Lavender J and Ineos v Persons Unknown [2017] EWHC 2945 (Ch), at para.114 per Morgan J. I take into account that the Defendants will still be able to protest and make their points in other lawful ways after the final injunction is granted, see Shell v Persons Unknown [2022] EWHC 1215, at para. 59 per Johnson J. I take into account that the impact on the rights of others of the Defendants' direct action, for instance at Kingsbury, is substantial for the reasons set out above. As well as being a public nuisance, the acts sought to be restrained are also offences contrary to s.137 of the Highways Act 1980 (obstruction of the highway), s.1 of the Public Order Act 2023 (locking-on) and s.7 of the Public Order Act 2023 (interference with use or operation of key national infrastructure). In these circumstances I do not consider that the Defendants have any realistic prospect of success on their potential defences.
  95. Balance of convenience – compelling justification

  96. In my judgment the balance of convenience and justice weigh in favour of granting the final injunction. The balance tips further in the Claimants' favour because I consider that there are compelling justifications for the injunction against the named Defendants and the PUs to protect the Claimants' 8 Sites d the nearby public from the threatened torts, all of which are at places which are part of the National Infrastructure. In addition, there are compelling reasons to protect the staff and visitors at the 8 Sites from the risk of death or personal injury and to protect the public at large who live near the 8 Sites. The risk of explosion may be small, but the potential harm caused by an explosion due to the tortious activities of a protester with a mobile phone or lighter, who has no training in safe handling in relation to fuel in tankers or storage tanks or fuel pipes, could be a human catastrophe.
  97. I also take into account the dangers involved in shutting down any refinery site. I take into account that a temporary emergency shutdown had to be put in place at Kingsbury on 7th April 2022 and the dangers that such safety measures cause on restart.
  98. I take into account that no spokesperson for any of the 4 Organisations has agreed to sign undertakings and that 17 Defendants have refused to sign undertakings. I take into account the dark and ominous threats made by Roger Hallam, the asserted co-founder of Just Stop Oil and the statements of those who assert that they speak for the Just Stop Oil and the other organisations, that some will continue action using methods towards a more excessive limit.
  99. Damages not an adequate remedy

  100. I consider that damages would not be an adequate remedy for the feared direct action incursions onto or blockages of access at the 8 Sites. None of the named Defendants are prepared to offer to pay costs or damages. 43 have sought to exchange undertakings for the prohibitions in the interim injunctions, but none offered damages or costs. Recovery from PUs is impossible and recovery from named Defendants is wholly uncertain in any event. No evidence has been put before this Court about the 4 Organisations' finances or structure or legal status or to identify which legal persons hold their bank accounts or what funding or equipment they provided to the protesters or what their legal structure is. Whilst no economic tort is pleaded the damage caused by disruption of supply and of refining works may run into substantial sums as does the cost to the police and emergency services resulting from torts or crimes at the 8 Sites and the access roads thereto. Finally, any health and safety risk, if triggered, could potentially cause fatalities or serious injuries for which damages would not be a full remedy. Persons injured or killed by tortious conduct are entitled to compensation, but they would always prefer to suffer no injury.
  101. (B) Procedural Requirements

    Identifying PUs

  102. In my judgment, as drafted the injunction clearly and plainly identifies the PUs by reference to the tortious conduct to be prohibited and that conduct mirrors the feared torts claimed in the Claim Form. The PUs' conduct is also limited and defined by reference to clearly defined geographical boundaries on coloured plans.
  103. The terms of the injunction

  104. The prohibitions in the injunction are set out in clear words and the order avoids using legal technical terms. Further, in so far as the prohibitions affect public highways, they do not prohibit any conduct which is lawful viewed on its own save to the extent that such is necessary and proportionate. I am satisfied that there is no other more proportionate way of protecting the Claimants' rights or those of their staff, invitees and suppliers.
  105. The prohibitions must match the claim

  106. The prohibitions in the final injunction do mirror the torts feared in the Claim Form.
  107. Geographic boundaries

  108. The prohibitions in the final injunction are defined by clear geographic boundaries which in my judgment are reasonable.
  109. Temporal limits - duration

  110. I have carefully considered whether 5 years is an appropriate duration for this quasi-final injunction. The undertakings expire in August 2026 and I have thought carefully about whether the injunction should match that duration. However, in the light of the threats of some of the 4 Organisations on the longevity of their campaigns and the continued actions elsewhere in the UK, the express aim of causing financial waste to the police force and the Claimants and the total lack of engagement in dialogue with the Claimants throughout the proceedings, I do not consider it reasonable to put the Claimants to the further expense of re-issuing for a further injunction in 2 years 7 months' time. I have seen no evidence suggesting that those connected with the 4 organisations will abandon or tire of their desire for direct tortious action causing disruption, danger and economic damage with a view to forcing Government to cease or prevent oil exploration and extraction.
  111. Service

  112. I find that the summary judgment application, evidence in support and draft order were served by alternative means in accordance with the previous Orders made by the Court.
  113. The right to set aside or vary

  114. The final injunction gives the PUs the right to apply to set aside or vary the final injunction on short notice.
  115. Review

  116. Provision has been made in the quasi-final injunction for review annually in future. In the circumstances of this case I consider that to be a reasonable period.
  117. Conclusions

  118. I grant the quasi-final injunction sought by the Claimants for the reasons set out above.
  119. END