[Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback] [DONATE] | |
England and Wales High Court (Commercial Court) Decisions |
||
|
You are here: BAILII >> Databases >> England and Wales High Court (Commercial Court) Decisions >> Trafigura Pte Ltd & Anor v Emirates General Petroleum Corp (EMARAT) [2010] EWHC 87 (Comm) (26 January 2010) URL: https://www.bailii.org/ew/cases/EWHC/Comm/2010/87.html Cite as: [2010] EWHC 87 (Comm) |
||
[New search]
[Context
]
[View without highlighting]
[Printable RTF version]
[Help]
QUEEN'S BENCH DIVISION
COMMERCIAL COURT
Strand, London, WC2A 2LL |
||
B e f o r e :
____________________
(1) TRAFIGURA PTE LTD(2) TRAFIGURA BEHEER BV |
Claimants |
|
| - and - |
||
| EMIRATES GENERAL PETROLEUM CORPORATION ("EMARAT") |
Defendant |
____________________
The Defendant did not appear and was unrepresented
Hearing dates: 18 December 2009
____________________
Crown Copyright ©
Mr Justice Tomlinson :
Introduction
i) The written contract dated 5 March 2008 on which the First Claimant sues is null and void, either because it is not signed on behalf of the Defendant by a person with capacity to sign on its behalf or because the signature it purportedly bears on behalf of the Defendant is a forged signature, of a person who in any event lacked capacity to bind the Defendant and moreover the purported signature is not witnessed and each individual page of the contract is not initialled by the signatory purportedly on behalf of the Defendant;
ii) The true terms of the contractual relationship between the First or perhaps the Second Claimant and the Defendant are to be found in e-mail exchanges culminating in January 2008. The first parcel ex Grace Victoria failed to comply with the contractual specification to be found in that earlier e-mail exchange, although not in the later signed contract, in that the Cetane index of the product supplied fell short of the contractual minimum 52, although it is also alleged to have fallen short of the minimum of 50 which the Claimants allege to have been agreed. The Defendant's alleged loss arising out of this discrepancy is not particularised. The relevant parcel was accepted by the Defendant notwithstanding its contemporary assertion that the ascertained Cetane index thereof was 47.6. The allegation that the seller was in this respect in breach of contract and that this had caused the buyer loss was first made in December 2008. The cargo had been delivered in August 2008.
iii) It is said that two of the invoices sent by the First Claimant to the Defendant on 19 and 20 August 2008 relating to the cargo ex Grace Victoria contain accounting mistakes. The First Claimant in fact raised three invoices bearing this date in respect of this cargo – Invoices Nos. 7314 and 7315 of 19 August and Invoice No. 7322 of 20 August. Invoices Nos. 7314 and 7322 have been paid. It is not explained of what the accounting irregularities consist.
iv) On 10 May 2009 the Defendant asserted for the first time that, over a three year period spanning 2006 to 2008, "
Trafigura"
had failed to comply with "The Common Customs Law for Arab States of Gulf (GCC States) No. 10/2003" pursuant to which as suppliers of cargoes shipped from outside the Arabian Gulf it was obliged to pay (scilicet to the Defendant as buyer) 5% of the invoice value of the cargoes supplied. An invoice was raised on the Second Claimant claiming US$28,705,671.14 in respect of 19 shipments. These shipments included the two parcels ex the Grace Victoria and the Hellespont Promise in respect of which the Defendant has paid the First Claimant in full, and other shipments delivered under the contract of 5 March 2008 which, the Claimants say, binds the First but not the Second Claimant. The Defendant appears to draw no distinction between the two
Trafigura
companies. On the invoice of 10 May 2009 it is said that "the amount will be offset against the payable to
Trafigura".
The Defendant does not recognise the jurisdiction of this Court and it has not invoked it in order to pursue a cross-claim. It might however assert that it enjoys a right of set-off against sums claimed in this action by the First or Second Claimant.
Trafigura
Group is an international commodities trader with a business presence in many parts of the world. The First Claimant
Trafigura
Private Limited is incorporated in Singapore. The Second Claimant
Trafigura
Beheer BV is incorporated in The Netherlands.
Trafigura
has a Contracts Administration Department with offices in London, Houston, Lucerne and Singapore.
Trafigura
has a branch office in Dubai. Mr Amjad Habbas is and was at all material times employed there by
Trafigura
Beheer BV, to whom I shall refer hereafter as "
Trafigura
BV", as manager of the
Trafigura
Group's Middle East operations. In that capacity he acts equally for and represents
Trafigura
Private Limited, to whom I shall refer hereafter as "
Trafigura
PTE" as well as other companies within the
Trafigura
Group.
Trafigura
PTE.
Trafigura
PTE on 15 June 2009, a document which was expressed to be submitted in respect of the jurisdiction issue alone.
Trafigura
PTE had clearly shown a good arguable case that it was party to a contract with Emarat that contained a clause conferring upon the English Court exclusive jurisdiction in respect of all disputes arising thereunder and providing further that the contract should be governed by and construed in accordance with English law. The Defendant's challenge to the jurisdiction therefore failed. Pursuant to CPR 11(7)(b) Flaux J directed that Emarat have 21 days within which to file an Acknowledgement of Service if so advised. That is the procedure available to a defendant who, having made an unsuccessful challenge to the jurisdiction of the court, wishes thereafter to defend the action on the merits. Defending the action on the merits can include, for example, a defendant against whom it has been determined that there is a good arguable case that it is bound by a contractual exclusive jurisdiction clause demonstrating at trial that in fact no contract was ever concluded between it and the Claimant. Flaux J also gave permission for
Trafigura
BV to be added to the proceedings as Second Claimant.
Trafigura
intended to rely at trial. Emarat was urged to instruct English solicitors, to participate in the proceedings and to defend itself at the trial. Emarat was advised in good time that the trial would take place on Friday 18 December 2009.
i) Amjad Habbas, to whom I have already referred;
ii) Alana Thompson, at all material times Contracts Administration Manager for the
Trafigura
Group, working out of the London office;
iii) Malcolm Drury, a Consultant Chemist called as an expert witness on the issue concerning the Cetane index of cargo shipped on board the Grace Victoria; and
iv) Richard Briggs, the Executive Partner at Hadef & Partners in Dubai, called as an expert witness in relation to the Customs and Environmental Law of the UAE.
All of these witnesses gave evidence in accordance with written statements and reports copies of which had previously been served on the Defendant. It was uncertain even up to the conclusion of the hearing on the afternoon of 18 December whether the Defendant would attend or participate in any way. In the event the Defendant took no part. In accordance with the usual tradition of the Court and of the Bar, Mr Bright endeavoured to draw to my attention such arguments as it was thought might be relied upon by the Defendant in answer to the claim.
The claim
Trafigura
PTE sues as seller under Contract No. 154876 dated 5 March 2008 pursuant to which it agreed to sell to Emarat 390,000 tonnes of gasoil, plus or minus 10% in seller's option, to be delivered cif two safe ports/berths UAE in 13 lots during the period 27 January to 31 December 2008. The invoices outstanding relate to part of the sixth and seventh shipments under this contract. Inclusive of those shipments 277,009.4 tonnes of gasoil were supplied by
Trafigura
PTE to Emarat between March and August 2008. In the light of the breakdown in relations between the parties
Trafigura
PTE has not tendered further performance. The failure of the buyer to make any payment under the contract is an event of default as defined therein. Upon the occurrence of an event of default the seller is entitled to suspend or to postpone performance of its obligations under the contract until such event of default is cured or until the seller exercises its right of termination.
Trafigura
and Emarat have a trading relationship dating back to, at least, 2006. Prior to the contract in question the parties had concluded at least 28 contracts, mostly spot sales of gasoil, although some for fuel oil and one for, in part, gasoline. Most were cif sales and all were concluded with
Trafigura
BV rather than with any other
Trafigura
entity. The contracts were in certain respects in broadly similar form – they all provided that payment should be made without any withholding, offset, counterclaim or deduction whatsoever and that interest would be payable on outstanding balances, based on LIBOR; they all specified that claims regarding quality or quantity were to be waived unless submitted in writing, together with supporting documentation, within 30 days from completion of discharge; they all provided that any other claims would be waived unless notified in writing within one year; they were all expressly made subject to English law and they all contained a submission of all disputes arising thereunder to the exclusive jurisdiction of the English court. Such terms are commonplace in oil trading contracts.
Trafigura.
Trafigura
would revert in writing and confirm an offer to Emarat. Emarat would then advise if the offer had been accepted, following which
Trafigura
would issue the contractual documentation and send it to Emarat. None of the contracts was signed and no issue was raised in relation thereto.
Trafigura
BV and Emarat agreed a contract which thereafter they referred to as the "semi-term" contract because it covered deliveries over several months during the second half of 2007. Although terms were agreed on 22 May 2007 the contractual documentation was dated 20 July 2007, reflecting the date when it was drawn up and issued by
Trafigura.
The contract was not signed, but it was performed by
Trafigura
BV and Emarat without problem and all the deliveries required by Emarat were made and paid for. The significance of this contract is that when
Trafigura
BV made its intial offer which led in due course to the conclusion of Contract No. 154876 it did so by reference to the terms of "the semi-term contract for 2007".
Trafigura
Susan Neesham, Emarat's Supply and Shipping Co-Ordinator said:
"As Emarat intends to purchase quite a few cargoes fromTrafigura
within the next few months we would like to establish a standard contract with you as it is not practical from our side to check every single contract. Having a standard format would require only logical amendments to be made for each sale and would allow Emarat to confirm promptly all contracts received from your side.
If it is possible, can you please send me a copy of a recent contract between our two companies in Word format so that I can add our amendments to any clause, if found applicable and this would make it easier for us to come to an agreement with regards to a final contract format.
Please let me have your prompt response."
In fact it was Emarat who on 18 June 2007 selected a contract of 8 May 2007 as the template, sending it to Ms Thompson annotated with suggested amendments. None of the clauses therein which are of particular relevance to the current dispute and which were in due course replicated in Contract No. 154876 were the subject of any comment by Emarat. The process culminated in a final draft sent by Ms Thompson to Emarat on 18 September 2007.
Trafigura"
to tender for the term supply of gas oil 0.05% S in 2008. The message dated 2 January was sent by Hassan Arab, Emarat's Finance and Accounts Manager and Chairman of the Tender Committee. The product was to be supplied on either a fob or a cif basis, at buyer's option for each cargo. When tendering
Trafigura
was asked "to take into account" certain Terms and Conditions which were then set out. These terms included the following:
"Custom taxes and customs dues if applied on the cargo shipped from outside the Arabian Gulf, to be on seller's account."
The terms set out by Emarat were very brief. They did not include the detailed terms and provisions which would habitually be incorporated into a term or any gasoil supply contract. It was probably in recognition of this that the invitation to tender concluded:
"Awaiting your offer along with your full terms and conditions for the supply of gasoil 0.05% S. (Specifications attached)."
As there indicated, there was included with the invitation to tender an "Emarat's Standard", a detailed specification for gasoil 0.05% S. The required Cetane index thereunder was minimum 52.
Trafigura
countered with the terms agreed in earlier transactions. It should also be remarked that the invitation to tender contains no suggestion that any contract resulting therefrom should be governed by the laws of the UAE or that the courts of the UAE should have jurisdiction, let alone exclusive jurisdiction, in respect of disputes arising thereunder.
Trafigura
BV by Mr Amjad Habbas responded to the invitation to tender by e-mail first on 10 January 2008, but then again on 13 January. The only difference I can detect between the two messages is that the premium for two port discharge had been slightly reduced, although not unnaturally the second message had a validity for acceptance which expired later than that of the first. The offer referred to the product as being gasoil 0.05% Sulphur (per attached specs). The specification attached stipulated a Cetane Index of minimum 50. Under Misc (miscellaneous)
Trafigura
BV countered:
"- Any customs duties and fees for Buyer's account.
- Terms to be as our semi-term contract for 2007."
The response was sent, as requested, to the Chairman of the Emarat Tender Committee.
- Hassan Al Arab;
- Ibraham Al Tamimi: Manager of Terminals and Logistics;
- Captain Ahmed Zainalddin: Manager of Logistics and Trading, and
- Rajeev Divakaran.
The latter is a signatory to the Defence of Emarat to which I referred in paragraph 5 above. He is there described as "Internal Audit". Whereas allegations of misconduct by various employees or former employees of Emarat in relation to this contract have from time to time been made or hinted at by Mr Al Midfa the involvement of Mr Divakaran and of Mr Al Arab has not been similarly impugned.
"Please note that your confirmation of the above prices is based on the following:
Payment to be 60 days from B/L date.
Interest on late payments will be paid @ LIBOR+1%
Pricing based on MOPAG under heading Gas oil. All terms and conditions stipulated in tender document to apply."
"Payment to be 60 days from B/L date. Interest on late payments will be paid @ LIBOR+1%. Pricing based on MOPAG under heading Gas oil."
He stopped short of commenting on the next sentence in Susan Neesham's message under reply "All terms and conditions stipulated in tender document to apply". He says that he did so deliberately, because he did not wish to accept those terms. That may be so, but it is an inadmissible consideration, and irrelevant to the proper construction of the message sent. In respectful disagreement with Flaux J, who thought otherwise, see paragraph 52 of his judgment of 26 June 2009, I consider that by failing to stipulate differently Mr Habbas was impliedly accepting that his confirmation of Emarat's prices was, as requested, "based on" all terms and conditions stipulated in the tender document applying. On this aspect therefore I reject the argument of Mr Bright as set out in paragraphs 86(2) and 87(2) of his skeleton argument prepared for the trial. As will appear hereafter in greater detail, this conclusion is however of little moment. Firstly, there was nothing in the tender document to displace the parties' agreement to English law and jurisdiction. Secondly, matters were in any event overtaken by events. On 22 January 2008 Susan Neesham e-mailed Mr Habbas awarding
Trafigura
the supply of 13 firm Gas oil cargoes during 2008 "based on your offer dated 13 January and subsequent clarifications". If matters had stopped there it would no doubt be the case that the contract would have to be regarded as containing Emarat's proffered clause on customs duties and to incorporate the Emarat specification where it differed from the
Trafigura
specification, hence a Cetane Index of minimum 52 rather than minimum 50. However the terms of
Trafigura's
offer of 13 January 2008, including therefore the provisions of the semi-term contract, would also have to be regarded as agreed save insofar as inconsistent with Emarat's tender document. As I have already recorded, the semi-term contract contained many detailed provisions on matters not addressed in the Emarat tender document, including law, jurisdiction and time bar. The different Cetane Index would ultimately be of no relevance since, as I find hereafter, the Cetane Index of the entire commingled cargo shipped on board the Grace Victoria was in excess of 52. As to customs duties, the cross-claim if there is one in respect of the earlier contracts by reference to the law of the UAE remains unaffected not least because many of the earlier contracts expressly stipulated that any customs duties were for buyer's account. Any claim would also be time barred. Claims in respect of any shipments in 2008 are likewise time barred as I discuss hereafter.
"Kindly forward your contract for the supply of Gas oil during 2008, please note that there should be only one standard contract for the entire supply of 13 confirmed cargoes, Emarat cannot accept individual contracts to cover each lifting.
This contract should be in accordance with the mutually agreed 2007 standard contract for the supply of Gas oil."
This was of course a reference to the standard form contract which had been under discussion between June and September 2007.
Trafigura
in the shape of Alana Thompson therefore drafted Contract No. 154876 using the standard terms tentatively agreed as at 18 September 2007. A first draft dated 4 February 2008 setting out the terms in full was sent to Susan Neesham on 5 February 2008. The draft identified the seller as
Trafigura
BV, although in error it described the product as Gasoil 0.25% as opposed to Gasoil 0.05%. This error was spotted internally by
Trafigura
and a revised draft was sent out on 6 February. On 7 February 2008 Susan Neesham reverted with Emarat's comments on the uncorrected draft sent on 5 February 2008. Emarat asked
Trafigura
to amend the quality clause to provide "in any case quality to meet Emarat tender specifications for Gas oil 0.05% S", but did not object to any other relevant provisions. On 12 February 2008
Trafigura
agreed to replace the erroneous 0.25% with 0.05%, expressly rejected Emarat's proposed amendment with regard to the specification but agreed to insert the full specification as per
Trafigura's
tender and did so. There was therefore now set out in extenso in the draft contract a specification which included a Cetane Index of minimum 50. On 18 February 2008 Susan Neesham confirmed receipt of the e-mail of 12 February 2008 and countered on the terms of the nomination clause but not on the quality specification. Emarat thereby signified that it was content to contract on
Trafigura's
specification and not by reference to its own original tender specification. No point was taken on any other relevant terms.
Trafigura
explained to Emarat that the version of the nomination clause in the contract had been agreed during negotiations for the standard form contract and that it had also been used since that template had been agreed. A revised draft of Contract No. 154876 was sent to Emarat later that day. On 24 February 2008 Emarat, this time in the shape of Captain Zainalddin, suggested to
Trafigura
by e-mail that "as long as we agree now on the contract we should use the same for all future contracts with logical amendments. For the current Gas oil term contract we do not need a contract for every cargo, all that we need is to agree with your operation people on the delivery option and that's it." In the same message Captain Zainalddin referred to the fact that once Ms Neesham returned from holiday she would work on "internal contract approval". There is no evidence to suggest that she did not do just that.
Trafigura
BV to
Trafigura
PTE. This was more convenient for
Trafigura
because it intended to source the cargoes in the Far East where
Trafigura
PTE would be the purchaser and it was preferable for the same company to be both purchaser and seller. Mr Al Tamimi agreed to the change. I have already remarked that Emarat appears to draw no distinction between the two
Trafigura
companies. Following this agreement a revised draft of Contract No. 154876 dated 5 March 2008 was sent to Emarat by the Contract Administrations Team in Singapore on 6 March 2008. All invoices under the contract were subsequently issued by
Trafigura
PTE and all payments were duly made to
Trafigura
PTE with the exception of course of the two invoices in respect of which no payment has been made. Even in respect of the parcels to which those invoices relate however Emarat issued Payment Undertakings direct to
Trafigura
PTE.
Trafigura
and Emarat became embroiled in a dispute concerning a joint venture pursuant to which they co-operated in supplying the state oil companies of Qatar, Bangladesh and Angola. The detail of this dispute does not matter save only that it involved an assertion by Emarat that relevant contracts did not bind it because they had not been authorised or signed by the then General Manager. The dispute was in due course resolved but its nature not unnaturally focussed the attention of both parties on the desirability of signed contracts. In consequence, both parties became keen that Contract No. 154876 should be signed.
Trafigura
towards the end of May 2008. Emarat was told that
Trafigura
required a signed copy of the contract for presentation to its bank. Whether that was a pretext I do not know and it does not matter. Emarat for its part asserted that it too required a signed contract as a pre-condition to its issuing payment undertakings as required under clause 10 of the contract. Emarat also insisted on
Trafigura
signing the contract first. It said that it required two signed and stamped originals, rather than simply copies sent by fax or as pdf e-mail attachments.
Trafigura
had a new bank which was financing its transaction with Emarat and that the bank had been asking for the signed contract and the list of authorised signatories before finalising the financing. Mr Al Tamimi was asked to provide both soonest. A response came from Susan Neesham, saying that she would follow up. Her message was copied to Mr Al Tamimi and it is of course to be inferred that she sent this message with his approval.
Trafigura
to stamp and sign the contract as "we require this on an urgent basis". Her e-mail specifically identified the contract as "Gas oil Contract 154876" although it erroneously referred to the date thereof as being 21 February 2008, which was in fact the date of a superseded draft. Her e-mail was copied internally both to Mr Al Tamimi and to Captain Zainalddin. It is to be inferred that she sent it in consequence of her having followed up the matter with her management.
Trafigura
PTE on 4 July 2008 and a copy was e-mailed to Emarat on the following day, addressed to Susan Neesham and copied to Mr Al Tamimi. On 6 July 2008 Susan Neesham sent an e-mail to Michael Bourdier of
Trafigura
as follows:
"As instructed by our AGM we request you to urgently send two signed and stamped originals of the 2008 Gas Oil contract. Emarat AGM will sign both originals and return one copy to you."
Her reference to the "AGM" is undoubtedly a reference to Mr Al Midfa, then the Acting General Manager. The inference is overwhelming that it was at Mr Al Midfa's own request and with his knowledge and authority that this message was sent. Furthermore, it was copied internally within Emarat to both Mr Al Tamimi and to Captain Zainalddin. On the same day Susan Neesham sent a yet further e-mail to Michael Bourdier in these terms:
"Can you please let us haveTrafigura
PTE bank account details ASAP as our AGM wishes to include these details in the PU."
Trafigura
an e-mail which attached a specimen draft Payment Undertaking letter for
Trafigura
to review. This e-mail was copied internally not only to Susan Neesham, Ibraham Al Tamimi and Rajeev Divakaran but also to Mr Al Midfa himself. The reference line in the specimen letter attached, as drafted and proffered by Emarat, referred to "Contract 154876 dated 5 March 2008 entered into between Emarat and
Trafigura
PTE".
Trafigura
PTE, were couriered to Dubai arriving at
Trafigura's
branch office there on or before 10 July 2008. That very day Captain Zainalddin sent an e-mail to Mr Habbas asking whether there was any news about the contract and payment undertaking or whether Emarat should seek alternative supply – this e-mail again was copied internally not only to Susan Neesham but also to Mr Al Midfa. Mr Habbas responded stating that
Trafigura
had the contract but was waiting on the payment undertaking wording. Captain Zainalddin replied:
"Is it possible to send with driver now before we close for the weekend."
Trafigura
in Dubai are close and the documents may have been delivered by
Trafigura's
office driver or even by Mr Habbas in person. It is possible that one of Emarat's drivers called in to collect them. At all events, Emarat clearly received the original contracts, because on 11 July it duly issued a payment undertaking for the next cargo, ex the vessel "Diyyinah", which had been withheld pending receipt of the hard copy of the contract documents signed by
Trafigura
PTE. This payment undertaking specifically refers to Contract No. 154876 dated 5 March 2008 and is signed by Mr Al Midfa. Neither Emarat nor Mr Al Midfa has suggested that the signature on this or any other payment undertaking is a forgery.
Trafigura
PTE; they were both signed by Mr Al Arab, not alleged by Mr Al Midfa to be implicated in the conspiracy.
"6. DELIVERY
EACH CARGO LOTS SHALL BE DELIVERED IN ONE OR MORE LOTS AS FULL OR PART CARGO CIF TWO SAFE PORTS/BERTHS UAE, ESTIMATED TO ARRIVE AT THE DISCHARGE PORT DURING THE TERM OF THIS CONTRACT AS MUTUALLY SCHEDULED BETWEEN THE PARTIES.
THE BUYER SHALL GIVE FULL WRITTEN DISCHARGE INSTRUCTIONS FOR THE NOMINATED DISCHARGE PORT TO THE SELLER AT LEAST 7 DAYS PRIOR TO THE VESSEL'S ETA AT THE DISCHARGE PORT AND THE SELLER SHALL NOT BE RESPONSIBLE FOR ANY DELAYS THAT ARISE DUE TO THE BUYER'S FAILURE TO DO SO.
IN THE EVENT THAT SELLER'S VESSEL IS NOT SUITABLE FOR A UAE PORT, BUYER MAY DISCHARGE CARGO VIA STS. IN THE EVENT OF AN STS DELIVERY THE PRICE WILL BE DISCOUNTED AS STATED IN CLAUSE 9 PRICE.
COSTS RELATING TO STS OPERATIONS WILL BE SOLELY FOR THE SELLER'S ACCOUNT.
ALL CHARGES AT THE DISCHARGE PORT, OTHER THAN THOSE DEFINED BY WORLDSCALE AS BEING FOR OWNERS' ACCOUNT (INCLUDING THE EXPENSE IF ANY, OF SHIFTING BERTH AT THE DISCHARGE PORT, UNLESS SUCH SHIFT SHALL BE FOR THE VESSEL'S PURPOSES), SHALL BE PAID BY BUYERS.
…
9. PRICE
THE UNIT PRICE IN US$/BBL CIF ONE SAFE PORT/BERTH UAE SHALL BE EQUAL TO THE AVERAGE OF MEAN QUOTATIONS IN THE PLATTS ASIA PACIFIC/ARABIAN GULF MARKETSCAN FOR GAS OIL UNDER THE HEADING 'FOB ARAB GULF PLUS A PREMIUM OF US$6.50/BBL..
FOR ANY CARGO DISCHARGED VIA STS TO BUYER'S VESSEL THE PREMIUM SHALL BE $6.00 PER BARREL
THE APPLICABLE QUOTATIONS SHALL BE THE QUOTATION ON BILL OF LADING DATE, THE TWO QUOTATIONS IMMEDIATELY PRECEDING THE BILL OF LADING DATE AND THE TWO QUOTATIONS IMMEDIATELY FOLLOWING THE BILL OF LADING DATE (2,1,2).
SHOULD THE BILL OF LADING DATE FALL ON A SATURDAY, SUNDAY OR PUBLIC HOLIDAY, THE THREE QUOTATIONS IMMEDIATELY PRECEDING THE BILL OF LADING DATE AND THE TWO QUOTATIONS IMMEDIATELY FOLLOWING THE BILL OF LADING DATE SHALL APPLY...
10. PAYMENT
THE BUYER SHALL PAY THE PRICE BY TT IN US DOLLARS NET CASH, WITHOUT ANY WITHHOLDING, OFFSET, COUNTERCLAIM OR DEDUCTION WHATSOEVER INTO THE SELLER'S NOMINATED BANK ACCOUNT WITH FULL VALUE LATEST 60 CALENDAR DAYS FROM THE BILL OF LADING DATE (B/L DATE = DAY ONE) ('PAYMENT DATE') AGAINST PRESENTATION BY THE SELLER OF:
(A) THE SELLER'S ORIGINAL COMMERCIAL INVOICE TO BE SUBMITTED 14 UAE WORKING DAYS PRIOR TO PAYMENT DUE DATE. SELLER WILL HOWEVER MAKE BEST ENDEAVOURS TO SEND BUYER TRADE CALCULATIONS PROMPTLY UPON COMPLETION OF PRICING WITH INVOICES TO FOLLOW SOON AFTER
(B) CERTIFICATE OF QUALITY AND/OR THE INDEPENDENT INSPECTOR'S QUALITY REPORT AT THE DISCHARGE PORT (TELEX/FAX ACCEPTABLE).
(C) CERTIFICATE OF QUALITY AND/OR THE INDEPENDENT INSPECTOR'S QUANTITY REPORT AT THE LOADPORT (TELEX/FAX ACCEPTABLE).
(D) 3/3 ORIGINAL BILLS OF LADING ISSUED TO OR ENDORSED TO THE ORDER OF THE BUYER PLUS THE ORIGINAL MASTER'S/AGENTS/VESSEL OWNER'S RECEIPT FOR THE MISSING 1/3 OPRIGINAL BILL OF LADING.
(E) ORIGINAL CERTIFICATE OR ORIGIN
(F) ORIGINAL CERTIFICATE OF INSURANCE
IF ANY OR ALL OF THE DOCUMENTS ARE NOT AVAILABLE AT THE PAYMENT DATE, THE SELLER SHALL PRESENT AND THE BUYER SHALL PAY AGAINST:
A. THE SELLER'S ORIGINAL (TELEX/FAX) COMMERCIAL INVOICE
B. THE SELLER'S (TELEX/FAX)LETTER OF INDEMNITY (TELEX OR FAX ACCEPTABLE) IN THE FOLLOWING FORM:…
…
WITHOUT PREJUDICE TO ANY OF THE SELLER'S OTHER REMEDIES, IF THE SELLER DOES NOT RECEIVE IN FULL PAYMENT INTO ITS NOMINATED BANK ACCOUNT ON THE PAYMENT DATE, THE BUYER SHALL PAY INTEREST ON ANY/ALL OUTSTANDING BALANCES (AT THE ONE WEEK LIBOR RATE AS QUOTED BY THE ROYAL BANK OF SCOTLAND ON THE PAYMENT DATE PLUS 1 PERCENT) UNTIL THE DATE PAYMENT IS RECEIVED INTO SELLER'S NOMINATED BANK ACCOUNT. SUCH INTEREST SHALL ACCRUE AND BECOME DUE ON A DAILY BASIS. THE FOREGOING SHALL NOT BE CONSTRUED BY THE BUYER AS AN INDICATED OF THE SELLER'S WILLINGNESS TO PROVIDE EXTENDED CREDIT AS A MATTER OF COURSE.
THE BUYER SHALL PROVIDE TO THE SELLER SECURITY IN RESPECT OF ITS PAYMENT OBLIGATIONS BY MEANS OF A PAYMENT UNDERTAKING IN THE FOLLOWING FORMAT SENT BY THE BUYER TO THE SELLER'S NOMINATED BANK LATEST 7 CALENDAR DAYS PRIOR TO THE FIRST DAY OF THE ESTIMATED ARRIVAL PERIOD AND TIME SHALL BE OF THE ESSENCE IN THIS RESPECT:…
11. INSPECTION
THE SELLER SHALL APPOINT AND INSTRUCT AN INTERNATIONALLY RECOGNISED INDEPENDENT INSPECTOR TO DETERMINE QUANTITY AT THE LOADPORT AND QUALITY AT THE DISCHARGE PORT IN ACCORDANCE WITH THE DETERMINATION OF QUANTITY AND QUALITY CLAUSE (THE 'INDEPENDENT INSPECTOR').
THE INDEPENDENT INSPECTOR SHALL BE ACCEPTABLE TO BOTH PARTIES, SUCH ACCEPTANCE NOT TO BE UNREASONABLY WITHHELD. ALL INSPECTION COSTS SHALL BE SHARED EQUALLY BETWEEN THE SELLER AND THE BUYER.
12. DETERMINATION OF QUANTITY AND QUALITY
THE INDEPENDENT INSPECTOR SHALL DETERMINE:
(A) THE QUALITY OF THE PRODUCT AT THE DISCHARGE PORT USING THE CUSTOMARY METHODS, PRACTICE AND PROCEDURE AT THE DISCHARGE PORT AND BASED UPON FULLY REPRESENTATIVE COMPOSITE SAMPLES DRAWN FROM THE TANKS OF THE PERFORMING VESSEL;
AND
(B) THE QUANTITY OF THE PRODUCT AT THE LOADPORT USING THE CUMSTOMARY METHODS, PRACTICE AND PROCEDURE AT THE LOADPORT.
SUCH DETERMINATIONS SHALL BE REPORTED ON THE CERTIFICATES OF QUALITY AND QUANTITY RESPECTIVELY, WHICH SHALL BE FINAL AND BINDING ON THE PARTIES FOR ALL PURPOSES SAVE FOR FRAUD OR MANIFEST ERROR.
THE BUYER SHALL SUBMIT TO THE SELLER ANY CLAIM AGAINST THE SELLER REGARDING THE QUALITY OR QUANTITY OF ANY PRODUCTS DELIVERED IN WRITING, TOGETHER WITH SUPPORTING DOCUMENTATION AND REASONABLE DETAILS OF THE FACTS ON WHICH THE CLAIM IS BASED, WITHIN 45 DAYS FROM THE DATE OF THE COMPLETION OF DISCHARGE (DISCONNECTION OF HOSES), FAILING WHICH THE BUYER'S CLAIM SHALL BE WAIVED AND ABSOLUTELY BARRED.
…
18. TITLE
TITLE TO THE PRODUCT SHALL PASS FROM THE SELLER TO THE BUYER WHEN THE PRODUCT PASSES THE PERMANENT FLANGE CONNECTION OF THE VESSEL'S INTAKE HOSE AT THE LOAD PORT. …
19. RISK
RISK OF LOSS, CONTAMINATION OR DAMAGE TO THE PRODUCT SHALL PASS FROM THE SELLER TO THE BUYER WHEN THE PRODUCT PASSES THE PERMANENT FLANGE CONNECTION OF THE VESSEL'S INTAKE HOSE AT THE LOAD PORT.
20. LAW AND JURISDICTION
THIS CONTRACT SHALL BE GOVERNED BY AND CONSTRUED IN ACCORDANCE WITH ENGLISH LAW, THE PARTIES HEREBY AGREE TO SUBMIT ALL DISPUTES HEREUNDER TO THE EXCLUSIVE JURISDICTION OF THE ENGLISH HIGH COURTS IN LONDON.
IF ANY DISPUTE ARISES UNDER OR IN CONNECTION WITH THIS CONTRACT, WHICH BOTH PARTIES FAIL TO SETTLE BY NEGOTIATION, THE PARTY SEEKING TO MAKE THE CLAIM SHALL COMMENCE LEGAL PROCEEDINGS WITHIN ONE YEAR FROM THE DATE OF THE COMPLETION OF FINAL DISCHARGE, FAILING WHICH THE CLAIM SHALL BE DEEMED WAIVED AND ABSOLUTELY BARRED WITHOUT RECOURSE TO LITIGATION OR ARBITRATION.
21. CLAIMS
IF ANY CLAIMS ARISE UNDER OR IN CONNECTION WITH THIS CONTRACT (OTHER THAN QUALITY AND QUANTITY CLAIMS COVERED IN CLAUSE 11), THE CLAIMING PARTY SHALL NOTIFY THE OTHER PARTY OF ITS CLAIM IN WRITING WITHIN 6 MONTHS FROM THE DATE OF THE COMPLETION FO FINAL DISCHARGE, FAILING WHICH THE CLAIM SHALL BE DEEMED WAIVED AND ABSOLUTELY BARRED.
…
28. TAXES AND LICENCES
THE BUYER SHALL BE LIABLE FOR AND SHALL INDEMNIFY THE SELLER ON AN AFTER TAX BASIS IN RESPECT OF THE FULL AMOUNT OF ALL TAXES, DUTIES, TARIFFS, IMPOSTS AND CHARGES ARISING AFTER DELIVERY OF THE PRODUCT OR LEVIED IN THE COUNTRY OF DISCHARGE ON OR BY REFERENCE TO OR PAYABLE IN RESPECT OF THE PRODUCT, ITS SALE, DELIVERY, IMPORT OR TRANSPORTATION OF IN RESPECT OF THE VESSEL, WHETHER RETROSPECTIVE OR NOT.
THE BUYER OR THE BUYER'S CUSTOMER SHALL BE THE IMPORTER OF RECORD AND SHALL BE RESPONSIBLE FOR COMPLYING WITH CUMSTOMS AND EXCISE ENTRY PROCEDURES AT THE DISCHARGE PORT AND SHALL BE LIABLE TO THE CUSTOMS AND EXCISE AUTHORITIES FOR ALL DUTIES AND TAXES THAT ARISE IN RESPECT OF SUCH CUSTOMS AND EXCISE ENTRY.
IF, PURSUANT TO THIS CLAUSE, THE BUYER IS LIABLE TO PAY AN AMOUNT OF TAX IN A CURRENCY OTHER THAN THE INVOICING CURRENCY FOR THE PRODUCT, THE SELLER MAY, AT ITS OPTION, PRESENT A TAX INVOICE IN EITHER THE LOCAL CURRENCY OF THE COUNTRY IN WHICH THE VAT, EXCISE DUTY OR OTHER TAX IS PAYABLE, OR IN THE INVOICING CURRENCY FOR THE PRODUCT, CONVERTED AT THE APPROPRIATE EXCHANGE RATE PREVAILING AT THE DATE OF THE TAX POINT UNDER THE RELEVANT TAX RULES.
THE BUYER SHALL INDEMNIFY THE SELLER IN RESPECT OF ANY COSTS, PENALTIES AND INTEREST INCURRED BY THE SELLER AS A DIRECT OR INDIRECT RESULT OF THE BUYER'S FAILURE TO PAY, OR DELAY IN PAYING, ANY VAT, EXCISE DUTY OR OTHER TAX IN ACCORDANCE WITH THIS CONTRACT.
THE BUYER SHALL OBTAIN AND MAINTAIN ALL LICENCES, CONSENTS, PERMITS, APPROVALS AND AUTHORISATIONS NECESSARY FOR THE IMPORT OF THE PRODUCT AND TO ENABLE IT TO PERFORM ITS OBLIGATIONS UNDER THE CONTRACT. ANY FAILURE TO COMPLY WITH THIS PROVISION SHALL NOT CONSTITUTE FRUSTRATION OR BE SUFFICIENT GROUNDS FOR A DECLARATION OF FORCE MAJEURE."
Trafigura
PTE Ltd ('
Trafigura')
and Emirates General Petroleum Company ('Emarat') dated 5 March 2008 for sale of Gasoline" and referred to the invoice sums then outstanding. At that time the sums outstanding included the amount now claimed in relation to the "Grace Victoria" as well as that due in relation to the "Diyyinah" and the "Blackfin". Mr Al Midfa responded noting
Trafigura's
concern and asking Mr Habbas to contact Mr Al Arab, Finance and Accounts Manager. Mr Al Midfa did not suggest that the contract was invalid or non-binding, nor did he complain about the quality of the material delivered ex "Grace Victoria".
Trafigura
under the contract and for which
Trafigura's
invoices were outstanding. From this Mr Habbas understood that Emarat did not take issue with any of
Trafigura's
invoices, that the reason for non-payment of the invoices was essentially cash-flow difficulties and that Emarat intended to settle them as soon as Emarat was in funds.
Invoice No. 7315 dated 19 August 2008 in the sum of US$41,948,306.91 in respect of cargo shipped on the "Grace Victoria" under Bill of Lading dated 25 July 2008;
Invoice No. 7403 dated 3 September 2008 in the sum of US$40,273,414.85 in respect of cargo shipped onboard the "Hellespont Promise" under Bill of Lading dated 29 July 2008.
"We apologise for the delay in settlement ofTrafigura
Invoices which were due in September 08. The funds from the Ministry of Finance are expected to be received by us shortly. We assure you that as soon as the funds are received by us, your invoices will be settled. Please bear with us in the meanwhile."
Trafigura
had acted in breach of contract. Even now liability to pay for the gasoil supplied was not denied. The e-mail from Mr Al Midfa to Mr Habbas of that date read:
"Subject: Gas Oil supply arrangement for 2008
We refer to the Emarat/Trafigura
Gas Oil supply arrangement for 2008. We wish to put on record that
Trafigura
has breached agreed supply arrangement as we have detected deviation from Emarat product specification, which constitutes a serious breach. This has resulted in considerable financial losses in the manner in which the product has been invoiced. Therefore we wish to emphasise that Emarat reserves all our rights to claim consequential damages resulting from
Trafigura's
breach. We hold you fully responsible for any damages on account of the above breach pending our full internal investigation of all issues relating to the above arrangements."
Trafigura
received from Emarat a copy of its "Judicial Notice" dated 22 December 2008. This suggested that the product to which two invoices dated 19 and 20 August 2008 referred did not comply with "the standard specification of the product" and further suggested that "heavy losses" had in consequence been sustained. No details were given of either the alleged non-conformity or the alleged losses. There were as I have already pointed out three invoices dated either 19 or 20 August, being two bearing the earlier date and one the later.
Trafigura
pointed out that no claim had hitherto been made. In fact the position concerning the "Grace Victoria", to which I return in more detail below, is that Emarat asserted when it accepted discharge from that vessel that the Cetane Index of one parcel of the cargo had been ascertained to be 47.4. It accepted discharge nonetheless. Captain Zainalddin then copied to
Trafigura
an e-mail which had on the same day, 17 August 2008, been sent to him by the responsible Emarat personnel which read as follows:
"Subject: MT Grace Victoria Cetane Index
According to Certificate of Quality the Test result of this Parcel Cetane Index is 47.4 which is below Emarat Min Requirement (50). Hence as per your instruction to accept and proceed with discharging, we have actioned accordingly."
This e-mail had been sent to Captain Zainalddin by Mr Khalfan, who is the supervisor of the Emarat terminal at Fujairah. It is perhaps just worth noting additionally that the Emarat minimum requirement is said by Mr Khalfan in that e-mail to have been 50, and not 52. Finally, at the meeting on 6 January 2009 Emarat raised a further point in relation to the basis upon which the invoice amount for the "Grace Victoria" had been calculated, without explaining precisely why it was said that the amount invoiced was incorrect.
Trafigura
in a fax message sent to Emarat three days later on 9 January, Emarat did not assert that Contract No. 154876 was not valid and binding. On the contrary, it asserted a breach thereof by
Trafigura.
It was only after Emarat had been served with these proceedings and in the light of developments therein that Emarat raised its point in relation to customs duty and for the first time challenged the validity of the contract. Thus after Cooke J had on 23 April 2009 granted an anti-suit injunction restraining Emarat from proceeding in the UAE and shortly before the return date of 5 June Emarat issued the invoice of 10 May 2009 to which I refer at paragraph 2(iv) above which for the first time raised the Customs Duty point. The allegation that Mr Al Midfa's signature had been forged, and that the contract was invalid, was first made on 4 June 2009 as again I have recorded above.
Trafigura
PTE in respect of the two unpaid invoices which relate to gasoil of which Emarat has taken delivery.
Trafigura
tendered. Additionally, it might be that it is
Trafigura
BV which is entitled to recover from Emarat rather than
Trafigura
PTE, although I am not sure that Emarat goes so far as to suggest that the novation of the contract can be ignored. I cannot however begin to understand how or why it is or can be suggested that anyone, whether at Emarat or
Trafigura,
would have had a motive to forge Mr Al Midfa's signature so as to bring about so limited a variation of the terms otherwise agreed as at 22 January 2008. Particularly is this so since the relevant terms were both the subject of extensive open correspondence between January and July 2008.
i) in the invoice of 10 May 2009, although not I think in the letter of 5 June and Defence of 4 June 2009, to the Common Customs Law for Arab States of Gulf (GCC States) No. 10/2003, and
ii) in the Defence, to the Environmental Law as stated by Emirates Authority for Standardisation and Metrology (ESMA) which is said to state that the Cetane Index is minimum 52 for gas oil supplied to the UAE.
I deal with these points separately.
Customs duty
Trafigura
responsible for payment of the relevant duty. Indeed, as Mr Briggs points out at paragraph 6.17 of his report placed before the Court, UAE Federal Law No. 18 of 1993 on Commercial Transactions (the "CTL") (Annex 5) states in Article 147 that "the buyer shall pay the import fees and the charges and expenses to clear the items sold at the port of discharge". Accordingly, unless the contract states otherwise, in accordance with Article 147 of the CTL, it is the buyer and not the seller which bears import fees, charges and expenses to clear any item. Even if Emarat has incurred Customs duties in respect of the two parcels for which it has not yet paid, as to which it has produced no evidence, it would still be obliged to pay
Trafigura
without any withholding even if the terms of the contract are to be regarded as frozen as at 22 January 2008. Any claim to recover such duty from
Trafigura
became time-barred six months after final discharge as provided by clause 21 of the semi-term contract. Final discharge occurred in August and September 2008. The claim in respect of Customs duties was not intimated until 10 May 2009.
Trafigura
PTE and Emarat provides clearly that Customs duties levied in the country of discharge are for buyer's account, entirely in line with Article 147 of the CTL.
Cetane Index
Trafigura
has produced a fabricated document, the allegedly signed contract, to use it as a cover to avoid prosecution under UAE law. Mr Briggs addresses this issue at paragraphs 6.2 to 6.13 of his report placed before the Court. ESMA is a federal UAE authority established to issue standards and technical regulations, which may be either optional or mandatory. Emarat has identified no particular ESMA standard specification upon which it relies. Mr Briggs' colleagues have contacted ESMA in order to identify what if any standard specification might require a minimum Cetane Index of 52 for gas oil, but they have been unable to identify an ESMA standard specification for gas oil, possibly because gas oil is not retailed as such. There are three ESMA standard specifications which refer to Cetane Index – GSO 477/1994 for diesel oil, and GSO 145/1991 and GSO 1041/2000, both of which relate to methods of testing for pollutants emitted by motor vehicles. None of these standard specifications is directly applicable to gas oil sold as such to a commercial entity such as Emarat, which could of course have blended it and/or sold it for a variety of different purposes. Cetane Index is a measure of the ignition performance of a diesel fuel oil in a standard engine by comparison with other reference fuels. The ESMA standard specification which might arguably therefore be relevant is GSO 477/1994. The Cetane Index in that standard specification is minimum 50. That may of course account for Mr Khalfan describing the Emarat minimum requirement as 50, as set out in his e-mail of 17 August 2008 passed on by Captain Zainalddin to Mr Holmes and Mr Habbas.
Trafigura
was in this respect in breach of contract is utterly specious, as is the suggestion that Emarat has in consequence suffered loss, which loss has of course never been quantified. This is no doubt why Emarat accepted the smaller parcel in full knowledge that its Cetane Index was or might have been or was asserted to be below 50.
Trafigura's
earlier invoices and in two cases subsequent invoices, all of which have been paid by Emarat without demur. Under Invoice No. 7315 dated 19 August 2008 US$41,948,306.91 fell due for payment on 22 September 2008. Under Invoice No. 7403 dated 3 September 2008 US$40,273,414.85 fell due for payment on 26 September 2008, the payment dates being in each case 60 calendar days after the date of the relevant Bill of Lading.
Trafigura
has provided evidence that the one week LIBOR rate as quoted by the Royal Bank of Scotland on the due date was 3.4% and 3.59% respectively. LIBOR plus one percent is not only the contractual rate but is also a rate of interest which the court regards as broadly reflective of the rate which a company such as
Trafigura
would be charged for borrowing.
Trafigura
PTE Ltd is entitled to judgment against the Defendant Emarat for the principal amounts claimed together with interest at the contractual rates.
Trafigura
has not been able to identify and locate all of the contracts under which the deliveries referred to by Emarat were made and indeed there are five alleged deliveries which
Trafigura is presently unable to confirm were made to Emarat. For this and other reasons the declaratory relief sought is in my judgment too wide in scope and it is inappropriate to grant it. It is sufficient to note, as I have already pointed out, that the First Claimant is entitled to the amount due without any withholding, offset, counterclaim or deduction.