You are here: BAILII >> Databases >> England and Wales High Court (Administrative Court) Decisions >> Residents Against Waste Site Ltd v Lancashire County Council & Anor [2007] EWHC 2558 (Admin) (07 November 2007) URL: https://www.bailii.org/ew/cases/EWHC/Admin/2007/2558.html Cite as: [2007] EWHC 2558 (Admin) |
||
[New search]
[Context
]
[View without highlighting]
[Printable RTF version]
[Help]
QUEEN'S BENCH DIVISION
ADMINISTRATIVE COURT
Strand, London, WC2A 2LL |
||
B e f o
r
e :
____________________
RESIDENTS AGAINST WASTE SITE LTD![]() |
Claimants |
|
| - and - |
||
LANCASHIRE COUNTY COUNCIL![]() GLOBAL RENEWABLES LTD![]() |
Defendant Interested Party |
____________________
WordWave International Limited
A Merrill Communications Company
190 Fleet Street, London EC4A 2AG
Tel No: 020 7404 1400, Fax No: 020 7831 8838
Official Shorthand Writers to the Court)
David Elvin QC and Charles Banner (instructed by
Lancashire County Council
) for the Defendant
Hearing dates: 20 -21 September 2007
____________________
Crown Copyright ©
Mr Justice Irwin :
Factual Background and Chronology
Lancashire County Council
[LCC] is both the
Waste
Disposal Authority and the
Waste
Planning Authority for
Lancashire
. The Interested Party, Global Renewables
Ltd
[Global] is the main contractor for building work on the relevant
site
. The Claimant,
Residents Against Waste Site
Limited [RAWS] is a limited company formed to represent the interests of local objectors to the development in question. The circumstances of the formation of the company are relevant and I address them later in these reasons. RAWS seeks judicial review of the grant of planning permission for a
waste
technology plant on the
site
of the old Leyland Vehicles Test Track at Farrington Moss, Leyland in
Lancashire
.
site
in question is 14.6 hectares in area. Previous planning permission was granted for a smaller
waste
disposal facility on the
site
. This plan would not have occupied the whole
site
and was not proceeded with, but forms a backdrop to this application. There has thus for a long period been the prospect of such a development on this
site
, in one form or another.
Waste
Disposable Authority applied to itself as
Waste
Planning Authority for planning permission for a large facility with a capacity of dealing with 305,000 tonnes of
waste
per year from households and civic amenities
sites
in the South Ribble, Preston, Chorley and West
Lancashire
areas. A plan of the
site
was included in the evidence before me.
Residents Against Waste Site
, although not yet as a limited company. This grouping contained and contains
residents
of Farrington Moss, Farrington and Leyland, and includes borough councillors from the area. The group became a focus of opposition to the development, co-ordinating and presenting opposition during the planning process.
site
visit to the committee in view of some of the issues raised, including traffic increase, the proximity of the development to local residential property, flood risk, the impact of the development on the health of local
residents
, noise odour and light pollution, ecological impact and contamination on the
site
.
site
and viewed the surrounding area, including a visit to 39 Bispham Avenue, the closest property to the
site
.
site
. On 31 October the Committee heard a 30 minute presentation from a Mr Carter of RAWS. On 1 November 2006, the Committee met once more and heard further oral representations from two
residents
and three borough councillors. At this meeting, the Committee also received a presentation from Mr Perigo, including a summary of the project and the issues, together with an update of representations received, a summary of representations received by RAWS and a variety of other points. At the conclusion of this meeting, the Committee resolved to grant planning permission for the development, subject to the applicant (LCC as
Waste
Disposal Authority) signing a unilateral obligation for the provision and management of off-
site
ecological mitigation. Permission was also to be subject to conditions set out in the recommendation with one additional condition.
Ltd
and was retained for the application before me. Mr Shiner saw some from the group on 29 November and on 1 December 2006 requested formal instructions from the group, and advised them of the need for urgency and promptness in making any application for judicial review and pointed out that an application would in any event have to be made before 21 February 2007. There was a further meeting on 11 December 2006, when it is clear that a fairly detailed explanation was given to the group as to what might be involved in mounting a legal challenge to the development.
Waste
PFI Contract with Global. This contract also provides for the development of another plant elsewhere in the
county
. These two facilities are intended to enable LCC and Blackpool
Council
to meet their obligations under the Landfill Directive and the
waste
emissions legislation, to divert biodegradable municipal
waste
from landfill. It thus follows that LCC and Global entered the contract in the knowledge of the legal challenge, as is made clear in the witness statement of Arthur Browne, LCC's Director for
Waste
and Natural Resources Management. It was considered that LCC had no realistic option other than to conclude the contract.
waste
technology plant such as this requires a
waste
management licence to be granted by the Environment Agency. This was given on 28 March 2007.
Standing
residents
and borough councillors who are members and officers of RAWS would as individuals have sufficient standing and that while they formed an incorporated association, those individuals and any unincorporated association formed of them, could properly bring this claim. The point thus turns on the formation of a company limited by guarantee.
" .the only reasonable conclusion is that the claimant was incorporated by members of the unincorporatedResidents Against Waste Site
solely for the purpose of limiting their exposure to costs."
He cites some text from the RAWS website, where the message he said is clear:
"We can limit our own liability by becoming a company limited by guarantee."
residents
who object to the grant of planning permission has standing to challenge that permission: see for example
R
v
- Leicestershire
County Council
ex parte Blackfordby and Boothorpe Action Group Limited [2001] Env LR 35 (Richards J) and Herefordshire
Waste
Watchers Limited
v
- Hereford
Council
[2005] EWHC 191(Admin) (Elias J). Mr Wolfe says it is not correct that there should be a test that such a company constitutes a "person aggrieved" and that such an approach has long been discredited see
R
v
- Inland Revenue Commissioners ex parte National Federation of Self Employed and Small Businesses [1982] AC617 per Lord Diplock 642b e. In so far as LCC rely upon the limit set out in
R
v
- Secretary of State for the Environment ex parte Rose Theatre Trust Co [1990] 1QB 504, Mr Wolfe says the approach in that case no longer represents the Courts approach to standing, see
R
v
- Somerset
Council
ex parte Dixon [1998] Env LR 111. In that case, Mr Justice Sedley, as he then was, reviewed extensively the development of the law on standing and then said this at page 121:
"I have taken some time on this issue because I am concerned to see that even the clear decision in the World Development Movement case, affirming as it does a strong line of modern authority and restoring as it turns out a powerful line of older authority, does not appear to have stopped attempts, some of them successful, to elevate the question of standing at the leave stage above the elementary level of excluding busybodies and trouble makers and to demand something akin to a special private interest in the subject matter. Such an argument may depending on the issue be insufficient even at the substantive hearing to exclude an applicant. At the leave stage it is, in my respectful view, entirely misconceived.
Public law is not at base about rights, even though abuses of power may and often do invade private rights; it is about wrongs that is to say misuses of public power; and the courts have always been alive to the fact that a person or organisation with no particular stake in the issue or the outcome may, without in any sense being a mere meddler, wish and be well placed to call the attention of the court to an apparent misuse of public power. If an arguable case of such misuse can be made out on an application for leave, the court's only concern is to ensure that it is not being done for an ill motive. It is if, on a substantive hearing, the abuse of power is made out, that everything relevant to the applicant's standing will be weighed up, whether with regard to the grant or simply to the form of relief."
County Council
submitted on the facts there that the company had been formed specifically
" .with the intention that its members would not be liable in costs should the proceedings fail"
and that in such circumstances as a matter of public policy, the Court should not accord standing to such a company. The learned Judge refused to draw the adverse inference in that case, but concluded that on the evidence there, the company had been formed to achieve a proper formal and legal structure to administer the funds of the action group in question and manage its affairs properly and to enable the group to represent the community in a more formal and acceptable way. The Judge went on to say this:
"In my view the incorporation of a local action group ought not to be a bar to the bringing of an application for judicial review. Technically, it may be said, the company does not have a relevant interest of its own; but in substance it represents the interests of localresidents
who, many of whom, do have a relevant interest. Incorporation has a number of advantages, some of which motivated the incorporation of the action group in this case. It is true that another advantage is the avoidance of substantial personal liability of members for the costs of unsuccessful legal proceedings. But that should not preclude the use of a corporate vehicle, at least where incorporation is not for the sole purpose of escaping the direct impact of an adverse costs order (and possibly even where it is for that purpose). The costs position can be dealt with adequately by requiring the provision of security for costs in a realistically large sum. In the present case, security was ordered in the sum of £15000. Whether that was sufficient may be open to doubt, given the sheer size of the case it is, however, the right approach in principle."
"To avoid the time and expense of making an application to the court, I am instructed to accept this offer without prejudice to our right to apply to the court at a later date for the security to be increased if there is any change in circumstances."
No further application for security has been made.
Lack of Promptness
R
(Hardy)
v
- Pembrokeshire
County Council
[2006] Env LR 16 and
R
(Malster)
v
- Ipswich Borough
Council
[2002] PLCR 14 [2001] EWCA Civ 1715. In both those cases, specific circumstances applied which meant that the claimant had been put on notice as to particular urgency of time and as to the risks and consequences that would be caused by delay.
"Promptness is not to be considered in the abstract. One is concerned with the practical implications of any lack of promptness. The interested parties could not reasonably have been expected to halt their multi million pound contracts in response to [tentative indications that proceedings may be issued]"
In the instant case, the Interested Party and Defendant did not halt their contracts in response to the actual issue of proceedings and there is no evidence on which I can find safely that they would in fact have done so had the proceedings been issued three or four weeks earlier.
The Substantive Grounds of Challenge
Waste
Management Licensing Regulations 1994, which paragraph sets out the relevant objectives in relation to the disposal or recovery of
waste
.
site
which the application for planning permission, and the
council
as planning authority, had recognised to be critical. I will take those 2 grounds in turn.
Ground 1 "The relevant objectives"
Waste
(75/442/EC as amended) are given effect in England by Regulation 19 and Schedule 4 of the
Waste
Management Licensing Regulations 1994 ("the Regulations"). Paragraph 2(1) of Schedule 4 to the Regulations requires that:
"The competent authorities shall discharge their specified functions, in so far as they relate to the recovery or disposal ofwaste
, with relevant objectives."
"For the purposes of this Schedule the following objectives are relevant objectives in relation to the disposal or recovery ofwaste
(a) ensuring that
waste
is recovered or disposed of without endangering health and without using processes or methods which could harm the environment and in particular without (i) risk to water, air, soil, plants or animals; or (ii) causing nuisance through noise or odours."
R
(Thornby Farms
Ltd
)-
v
- Daventry District
Council
[2002] EWCA Civ 31, (2003) QB 503. At paragraph 53, Pill LJ held:
"An objective in my judgment is something different from a material consideration. I agree with Richards J that it is an end at which to aim, a goal. The general use of the word appears to be a modern one. In the 1950 edition of the Concise Oxford Dictionary the meaning now adopted is given only a military use: "towards which the advance of troops is directed". A material consideration is a factor to be taken into account when making a decision and the objective to be attained will be such a consideration, but it is more than that. An objective which is obligatory must always be kept in mind when making a decision even while the decision-maker has regard to other material considerations. Some decisions involve more progress towards achieving the objective than others. On occasions, the giving of weight to other considerations will mean that little or no progress is made. I accept that there could be decisions affectingwaste
disposal in which the weight given to other considerations may produce a result which involves so plain and flagrant a disregard for the objective that there is a breach of obligation. However, provided the objective is kept in mind, decisions in which the decisive consideration has not been the contribution they make to the achievement of the objective may still be lawful. I do not in any event favour an attempt to create a hierarchy of material considerations whereby the law would require decision-makers to give different weight to different considerations."
"The proposal would not result in unacceptable [emphasis added] adverse impacts on people or the environment by reason of noise, odour, dust or traffic."
See the Grounds paragraph 21. Indeed, throughout the written and oral submissions of the Claimant, the approach was really consistent: the report to the Committee, the supporting documentation and, by extension, the decision of the LCC was couched in statements that environmental impacts of the kind which engaged the relevant objectives were "acceptable" or "not unacceptable"; levels of emissions were "at appropriate levels".
council
's report did not deal with or respond to suggestions which
residents
had raised including the choice of
site
access and the location within the
site
of the diesel storage tanks and the "wagon wash". While these are not insignificant questions, they are relatively limited in scope.
Lancashire
Minerals and
Waste
Local Plan was adopted on 28 December 2001. This plan was adopted taking into account and giving effect to the relevant objectives, which were set out extensively in Appendix 6 to the plan and the plan itself in paragraph 1.8 makes direct reference to the need to the key objectives. There are other stipulations throughout the plan itself emphasising the importance of the relevant objectives.
Lancashire
Structure Plan adopted in March 2005. The objectives also feature directly in the drafting of the LCC's Municipal
Waste
Management Strategy [MWSS]. In short, LCC contends that the governing development plans and the Municipal
Waste
Management Strategy all incorporated the objectives and set a strong framework within which this particular application was prepared.
Waste
Directive and the relevant objectives. In addition, at the level of planning application Mr Perigo emphasised that:
"All planning applications must be assessedagainst
the policies of the development plan. Given the nature of this proposal it is important to consider it
against
the relevant objectives. The reports clearly assess the proposals
against
all the relevant development plan policies. These policies reflect the objectives of the framework. It was considered unnecessary to reiterate the objectives when they are so clearly reflected in the relevant policies."
"I take issue with the Claimant's approach to the Report to Committee. It was not balancing benefits from the proposalsagainst
the harm it (sic) might cause. Instead officers were satisfied that any potential problems associated with the proposal had been dealt with and that the proposal complied with the Plan Policies (drafted to embody the WFD Objectives) without generating unacceptable impacts. This was not a case where officers (with whom members agreed) considered that the benefits had to be set
against
breaches of policy in order to justify the ground of permission."
Ground 2: Routeing of Traffic
site
was of particular concern to many of the
residents
. The complaint is that LCC unlawfully failed to secure the traffic routeing which the application for planning permission, and the
council
as planning authority, had recognised to be critical, and as a consequence the
council
acted unlawfully in granting planning permission. The desirable traffic routeing is not really the issue here. The question is one of enforcement.
Waste
and Minerals Policy, within the Environment Directorate of LCC. Mr Geldard explained that there were widespread representations from the public and other interested parties about traffic routeing and that with changes to the
site
area, it became feasible to meet those requests. Thus even though it was not considered essential by the
council
as planning or highway authority, the
council
as
Waste
Development Authority decided the proposal should only utilise the northern entrance. Mr Geldard goes on to explain that there is a contractual obligation between LCC and Global to comply with routeing provisions, which can be enforced as between those parties by penalties under the contract and policed using satellite navigation technology.
Waste
Development Authority and Global do not run with the land. Here lies the problem.
v
- Secretary of State [1995] 1 WLR 759 at 780. The Defendants further argued that national policy advises that conditions should only be imposed if they are "necessary, relevant to the development to be permitted" and "reasonable in all other respects". At the time of this decision, the relevant Department of Environment circular was DOE Circular 11/95 which at paragraph 71 advises:
"Planning conditions are not an appropriate means of controlling the right of passage over public highways."
site
such as this. In the end, I was unpersuaded by this argument as a basis of a claim for judicial review. While such a condition might be possible, it would require careful drafting. In the face of established planning practice and national policy as outlined, it would hardly be irrational or unlawful to grant planning permission in the absence of such a planning condition.
site
.
Waste
Development Authority offering, and in any event LCC as
Waste Planning Authority insisting upon, the relevant contractual stipulations as to traffic routeing being made a planning obligation, within the meaning of Section 106 of the Town and Country Planning Act 1990. In the context of a highly vexed and difficult application such as this one, that should have been considered essential.
Conclusion